Roads18KC0012

CONCRETING/ROAD REHABILITATION ALONG JCT. SAYRE HIGHWAY LEADING TO MAMBATANGAN NBI NEMRO DRUG REHABILITATION CENTER, K0+000- K0+950.52, MAMBATANGAN, MANOLO FORTICH, BUKIDNON

CONCRETING/ROAD REHABILITATION ALONG JCT. SAYRE HIGHWAY LEADING TO MAMBATANGAN NBI NEMRO DRUG REHABILITATION CENTER, K0+000- K0+950.52, MAMBATANGAN, MANOLO FORTICH, BUKIDNON is a DPWH-tracked public work in Bukidnon 3rd DEO, Region X. Reported contract value: ₱10,841,952.86. Status: Reported complete (DPWH). Contractor on record: LBL TRAFFIC CONTROL AND CONST SERVICES. Figures trace to dpwh.

Bukidnon 3rd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROVIII-18-0005873 · ₱1,778,742 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18KC0012 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-01-20 → 2025-07-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱11,406,578 per km= 0.4x the Region X median (n=105)

Contract cost ₱10,841,953 ÷ 0.951 km read from the DPWH title (“K0+000- K0+950.52”; K-post / station range length). National percentile: 5. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING/ROAD REHABILITATION ALONG JCT. SAYRE HIGHWAY LEADING TO MAMBATANGAN NBI NEMRO DRUG REHABILITATION CENTER, K0+000-            K0+950.52, MAMBATANGAN, MANOLO FORTICH, BUKIDNON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure along Sayre Highway with slope protection, Alae-Kisolon Section, Maluko, Manolo Fortich, Bukidnon
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVIII-18-0005873

₱1,778,742.00 · FY2018

Released to Southern Leyte District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱10,841,952.86

Progress

Reported complete (DPWH)

Start Date

March 8, 2018

Target End

June 16, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)City of Cagayan De OroPuerto
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.