Roads22KL0063

REHABILITATION OF ROAD FROM BARANGAY CP GARCIA TO BARANGAY G. PELAEZ, GITAGUM, MISAMIS ORIENTAL

REHABILITATION OF ROAD FROM BARANGAY CP GARCIA TO BARANGAY G. PELAEZ, GITAGUM, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 2nd DEO, Region X. Reported contract value: ₱9,900,000.00. Status: Reported complete (DPWH). Contractor on record: MORTAR MASTERS. Figures trace to dpwh.

Misamis Oriental 2nd DEO, Region X
Region: Region X

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22KL0063 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-12-12 → 2025-10-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION OF ROAD FROM BARANGAY CP GARCIA TO BARANGAY G. PELAEZ, GITAGUM, MISAMIS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, Purok 2, Barangay Maanas, Medina, Misamis Oriental
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Misamis Oriental 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

120 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD, BRGY. MANIWAYA, STA. CRUZ, MARINDUQUE (PHASE II), STA. 0+000-STA. 1+580 (RIGHT SIDE OF PIER); STA. 0+000-STA. 0+540 (LEFT SIDE OF PI

Region IV-B, Region IV-B

2022₱140.3M
Past target date (DPWH On-Going)
No sat.

NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG DAANG MAHARLIKA LT, SOGOD, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2021₱96.5M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, LILOY-SIOCON RD - K2043 + 550 - K2043 + 642

Zamboanga del Norte 4th DEO, Region IX

2023₱82.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF UPPER CARMEN TO CANITOAN DRAINAGE SYSTEM, CAGAYAN DE ORO CITY

Cagayan de Oro City 1st DEO, Region X

2023₱72.4M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, SINDANGAN-LILOY RD - K1937 + 920 - K1937 + 980, K1938 + 080 - K1938 + 135, ZAMBOANGA DEL NORTE

Zamboanga del Norte 3rd DEO, Region IX

2023₱70.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS - CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, K0018+573.0-K0018+840, CEBU CITY

Cebu City DEO, Region VII

2021₱67.5M
Reported complete (DPWH)
View all 120 projects →

4. Implementation

Contract Amount

₱9,900,000.00

Progress

Reported complete (DPWH)

Start Date

April 1, 2022

Target End

June 17, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Misamis OrientalGitagumUlab
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.