Flood Control and Drainage18ND0105

CONSTRUCTION OF BANK PROTECTION, BRGY. MAON CREEK WITH RCBC, BUTUAN CITY, AGUSAN DEL NORTE

CONSTRUCTION OF BANK PROTECTION, BRGY. MAON CREEK WITH RCBC, BUTUAN CITY, AGUSAN DEL NORTE is a DPWH-tracked public work in Butuan City DEO, Region XIII. Reported contract value: ₱6,046,597.59. Status: Reported complete (DPWH). Contractor on record: RAMISES CONST. Figures trace to dpwh.

Butuan City DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱40,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXIII-18-0000316 · · release to the district office, not itemized per project

    Possible match · score 0.82

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18ND0105 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-07-01 → 2025-11-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Agusan del Norte

Based on the coordinates published with the DPWH record and NOAH file AgusanDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BANK PROTECTION, BRGY. MAON CREEK WITH RCBC, BUTUAN CITY, AGUSAN DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Dredging/Desilting at Masao Rivermouth and Construction of Cut-off Channel w/Bridge at Masao River, Butuan City, Agusan del Norte
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXIII-18-0000316

₱0.00 · FY2018

Released to Division of Butuan City (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱6,046,597.59

Progress

Reported complete (DPWH)

Start Date

July 18, 2018

Target End

December 5, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)City of ButuanPangabugan
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.