LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - DPWH MULTI-PURPOSE BUILDING (PHASE II)

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - DPWH MULTI-PURPOSE BUILDING (PHASE II) is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱19,577,671.87. Status: Reported complete (DPWH). Contractor on record: CL CARANDANG CONST AND SUPPLY CORP FORMERLY: CL CARANDANG ENT. Figures trace to dpwh.

Masbate 3rd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱18,617,283 · C L CARANDANG ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-01-07 → 2022-08-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - DPWH MULTI-PURPOSE BUILDING (PHASE II)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System along Lumbang River, Masbate City
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Masbate 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20FJ0004

₱18,617,283.30 · C L CARANDANG ENTERPRISES

Award / contract ref: 20FJ0004

Contractor

B

194 projects · ₱2.4B total · 0 flags

Other projects by this contractor

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAN RAMON RIVER, USON, MASBATE

Masbate 3rd DEO, Region V

2024₱96.4M
Reported complete (100% progress, DPWH status On-Going)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BATUILA RIVER, BALENO, MA

Masbate 2nd DEO, Region V

2025₱85.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY ROADS, MASBATE- CATAINGAN- PLACER ROAD, K0070+485- K0072+870

Masbate 3rd DEO, Region V

2019₱67.4M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF MASBATE CITY PORT-COASTAL ROAD (DIVERSION ROAD). MASBATE CITY, MASBATE

Masbate 2nd DEO, Region V

2022₱64.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS - BALUD - PALANI - PANUBIGAN - PAJO - TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGAN, PAJO AND TALISAY MANGROVE AREA, BRGY. TALIS

Masbate 2nd DEO, Region V

2020₱61.6M
Reported complete (DPWH)
No sat.

ROAD WIDENING - ALONG MINDORO WEST COASTAL RD ( S00095MR) K0231+556 - K0233+216, SAN JOSE, OCC. MINDORO

Mindoro Occidental DEO, Region IV-B

2019₱49.0M
Reported complete (DPWH)
View all 194 projects →

4. Implementation

Contract Amount

₱19,577,671.87

Progress

Reported complete (DPWH)

Start Date

November 25, 2020

Target End

July 23, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateDimasalangBalocawe
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.