Buildings and Facilities23KK0173

CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM, DAMPIL NHS, LAGONGLONG, MISAMIS ORIENTAL

CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM, DAMPIL NHS, LAGONGLONG, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱29,293,669.23. Status: Reported complete (DPWH). Contractor on record: CHIU BUILDERS. Figures trace to dpwh.

Misamis Oriental 1st DEO, Region X
Region: Region X

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23KK0173 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-08-07 → 2025-07-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱3,661,709 per classroom= 1.9x the Region X median (n=280)

Contract cost ₱29,293,669 ÷ 8 classroom read from the DPWH title (“EIGHT (8) CLASSROOM”; classroom count in title). National percentile: 98. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM, DAMPIL NHS, LAGONGLONG, MISAMIS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, Upstream of Dangoan Bridge 1, Medina, Misamis Oriental
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Misamis Oriental 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱29,293,669.23

Progress

Reported complete (DPWH)

Start Date

July 14, 2023

Target End

January 22, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM, DAMPIL NHS, LAGONGLONG, MISAMIS ORIENTAL.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/95e1cdf7-6ad6-4fbc-9d1f-f5b2734c1ea6

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Misamis OrientalLagonglongDampil
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.