GAA 2023 CSSP23HN0141

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BASAK-MARIGONDON ROAD, LAPU-LAPU CITY, CEBU

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BASAK-MARIGONDON ROAD, LAPU-LAPU CITY, CEBU is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱33,775,000.00. Status: Reported complete (DPWH). Contractor on record: PHIL ASIA RESOURCES & DEVELOPMENT CORP. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱18,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23HN0141 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-09-23 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BASAK-MARIGONDON ROAD, LAPU-LAPU CITY, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱18,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, Brgy. Caubian, Olango Island, Lapu-Lapu City, Cebu
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cebu 6th DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

9 projects · ₱410.5M total · 0 flags

Other projects by this contractor

No sat.

CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES A. TUMULAK ROAD IN BARANGAY GUN-OB, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2023₱62.7M
Reported complete (DPWH)
No sat.

CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGO ISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2024₱61.2M
Past target date (DPWH On-Going)
No sat.

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT S. OSMENA ST., LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2024₱57.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CSSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. CANJULAO, LAPU-LAPU CITY

Cebu 6th DEO, Region VII

2024₱49.2M
Reported complete (DPWH)
No sat.

SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - COASTAL ROADS TO AUGMENT RESILLIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, OLANGO ISLAND, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2025₱48.9M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2025₱39.2M
Past target date (DPWH On-Going)
View all 9 projects →

4. Implementation

Contract Amount

₱33,775,000.00

Progress

Reported complete (DPWH)

Start Date

June 1, 2023

Target End

January 16, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of Lapu-LapuMarigondon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.