Buildings and Facilities18HG0060

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; BUILDINGS AND OTHER STRUCTURES; MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN CAWAYAN CES, DALAGUETE, CEBU

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; BUILDINGS AND OTHER STRUCTURES; MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN CAWAYAN CES, DALAGUETE, CEBU is a DPWH-tracked public work in Cebu 2nd DEO, Region VII. Reported contract value: ₱1,880,633.32. Status: Reported complete (DPWH). Contractor on record: APRIL ROSE ENT. Figures trace to dpwh.

Cebu 2nd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVB-18-0019685 · ₱622,420 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18HG0060 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-15 → 2024-08-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; BUILDINGS AND OTHER STRUCTURES; MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN CAWAYAN CES, DALAGUETE, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Lamacan River (downstream and upstream), Sibonga, Cebu
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVB-18-0019685

₱622,420.00 · FY2018

Released to Mabini National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

78 projects · ₱455.7M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD_MANAGEMENT_PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ALO SEAWALL ALONG N. BACALSO AVE., OSLOB, CEBU

Cebu 2nd DEO, Region VII

2019₱29.4M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT - CONSTRUCTION OF LUSAPON FLOOD CONTROL, BOLJOON, CEBU

Cebu 2nd DEO, Region VII

2019₱24.8M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF DALAGUETE RIVER FLOOD CONTROL STRUCTURE (UPSTREAM), K0085+739, DALAGUETE, CEBU

Cebu 2nd DEO, Region VII

2019₱19.0M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT- CONSTRUCTION OF KAWAYAN RIVER FLOOD CONTROL, DALAGUETE, CEBU

Cebu 2nd DEO, Region VII

2019₱19.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N. BACALSO AVE (CEBU SOUTH RD) - K0121+947 - K0122+808

Cebu 2nd DEO, Region VII

2023₱17.9M
Reported complete (DPWH)
No sat.

A. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KANLUNSING, TUBURAN, CEBU; B. CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO LABANGON, BRGY. KABANGKALAN, TUBURAN, CEBU;C. CONSTRUCTION OF MULTI-PURPOSE BU

Cebu 3rd DEO, Region VII

2020₱14.7M
Reported complete (DPWH)
View all 78 projects →

4. Implementation

Contract Amount

₱1,880,633.32

Progress

Reported complete (DPWH)

Start Date

February 28, 2018

Target End

May 28, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; BUILDINGS AND OTHER STRUCTURES; MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN CAWAYAN CES, DALAGUETE, CEBU.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/9d78415e-f7f0-4184-9fe4-6c0341a419f9

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuDalagueteCawayan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.