Construction of Flood Mitigation Structure23MH0019

Construction of River Bank Protection/Flood Control at Limulan River (Upstream), Kalamansig, Sultan Kudarat

Construction of River Bank Protection/Flood Control at Limulan River (Upstream), Kalamansig, Sultan Kudarat is a DPWH-tracked public work in KALAMANSIG (SULTAN KUDARAT), SULTAN KUDARAT, Region XII. Reported contract value: ₱71,120,500.88. Status: Reported complete (DPWH). Contractor on record: MUST ENT / ALBANOR CONST. Figures trace to sumbong.

KALAMANSIG (SULTAN KUDARAT), SULTAN KUDARAT, Region XII
Region: Region XII

Money Trail

1. Appropriation

Probable match · score 93%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Bank Protection/Flood Control at Brgy. Ala, Esperanza, Sultan Kudarat
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Sultan Kudarat 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱71,120,500.88

Progress

Reported complete (DPWH)

Start Date

March 8, 2023

Target End

March 3, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.