Buildings and Facilities17HD0155No coordinates published by DPWH

COMPLETION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, ANONANG SUR ES, BOGO CITY, CEBU

COMPLETION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, ANONANG SUR ES, BOGO CITY, CEBU is a DPWH-tracked public work in Cebu 4th DEO, Region VII. Reported contract value: ₱2,327,114.29. Status: Reported complete (DPWH). Contractor on record: GOLDFIN CONSTRUCTION. Figures trace to dpwh.

Cebu 4th DEO, Region VII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0011285 · ₱113,011 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17HD0155 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: COMPLETION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, ANONANG SUR ES, BOGO CITY, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Completion of Alegria river flood control dike, Alegria, Cebu
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0011285

₱113,011.00 · FY2017

Released to Calbiga National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

39 projects · ₱632.2M total · 0 flags

Other projects by this contractor

No sat.

CSSP : CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) - CONSTRUCTION OF ROAD, BRIGADIER GENERAL BENITO N. EBUEN AIR

Cebu 6th DEO, Region VII

2022₱49.0M
Reported complete (DPWH)
No sat.

LP: CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ROAD CONCRETING AND DRAINAGE INSTALLATION OF BASAK-AGUS ROAD, CEBU

Cebu 6th DEO, Region VII

2020₱45.8M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING PRIMARY ROADS; N.BACALSO AVE (CEBU SOUTH ROAD) - K0072+800 - K0074+238

Cebu 2nd DEO, Region VII

2021₱35.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

LP: LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL/DRAINAGE (MAHAYAHAY ROAD), BARANGAY BANKAL, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2021₱32.9M
Reported complete (DPWH)
No sat.

CSSP - CONST./IMPROVEMENT OF ACCESS RD. LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (RD. LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) - BASAK-AGUS RD. CONNECTING TO NAT'L. HIGHWAY IN SUPPORT OF MANUFACTURING INDUSTRIE

Cebu 6th DEO, Region VII

2021₱32.8M
Reported complete (DPWH)
No sat.

LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GUN-OB, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2020₱29.9M
Reported complete (DPWH)
View all 39 projects →

4. Implementation

Contract Amount

₱2,327,114.29

Progress

Reported complete (DPWH)

Start Date

December 11, 2017

Target End

January 29, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “COMPLETION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, ANONANG SUR ES, BOGO CITY, CEBU.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/a2661f3b-a4a7-40ac-ac48-739dac52490e

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)Cebu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.