Flood Control and Drainage20PM0007

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF TANUDAN FLOOD CONTROL, BARLIG, MOUNTAIN PROVINCE

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF TANUDAN FLOOD CONTROL, BARLIG, MOUNTAIN PROVINCE is a DPWH-tracked public work in Mountain Province 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱9,505,051.61. Status: Reported complete (DPWH). Contractor on record: CHUWARCHO CONST. Figures trace to dpwh.

Mountain Province 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱10,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20PM0007 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-12-04 → 2023-03-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Mountain Province

Based on the coordinates published with the DPWH record and NOAH file MountainProvince.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF TANUDAN FLOOD CONTROL, BARLIG, MOUNTAIN PROVINCE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Tanudan Flood Control, Barlig, Mountain Province
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Mountain Province 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

8 projects · ₱97.1M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS, BALILI-SUYO-SAGADA ROAD LEADING TO SAGADA CAVES, BURIAL CAVES, RICE TERRACES AND WATERFALLS, BONTOC AND SAGADA, MT. PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2016₱34.4M
Reported complete (DPWH)
No sat.

CSSP-ACCESS ROADS TO TOURISM DESTINATION, SABANGAN-SAGADA RD.

Mountain Province 1st DEO, Cordillera Administrative Region

2018₱14.3M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, TANUDAN-BARLIG-IFUGAO ROAD, MOUNTAIN PROVINCE CHAINAGE 0-CHAINAGE 540

Mountain Province 2nd DEO, Cordillera Administrative Region

2020₱9.5M
Reported complete (DPWH)
No sat.

CSSP-SAGADA-AGUID ROAD IN SUPPORT OF COFFEE WEAVING, FOOD PROCESSING AND TOURISM INDUSTRIES, SAGADA, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2020₱9.5M
Reported complete (DPWH)
No sat.

RESTORATION OF COLLAPSED REINFORCED CONCRETE RETAINING WALL ALONG SABANGAN-SAGADA ROAD LEADING TO POBLACION SAGADA, SUMAGUING CAVE, HANGING COFFINS, BOMOD-OK FALLS, BOKONG FALLS, MARCOS CAVE, SAGADA, MOUNTAIN PROVINCE

Cordillera Administrative Region, Cordillera Administrative Region

2016₱7.6M
Reported complete (DPWH)
No sat.

NDRRMF-REHABILITATION/RECONSTRUCTION/REPAIR OF CHICO RIVER FLOOD CONTROL, PALING - EYEB SECTION, STA. 0+000 - STA. 0+350 (I.S.), BONTOC ILI, BONTOC, MT. PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2018₱7.5M
Reported complete (DPWH)
View all 8 projects →

4. Implementation

Contract Amount

₱9,505,051.61

Progress

Reported complete (DPWH)

Start Date

October 13, 2020

Target End

February 9, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Mountain ProvinceBarligLias Kanluran
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.