Buildings and Facilities18EB0180

CONSTRUCTION OF STANDARD 2STY-4CL SCHOOL BUILDIING (BATCH 3), TANYAG NHS, CALINTAAN, OCCIDENTAL MINDORO

CONSTRUCTION OF STANDARD 2STY-4CL SCHOOL BUILDIING (BATCH 3), TANYAG NHS, CALINTAAN, OCCIDENTAL MINDORO is a DPWH-tracked public work in Mindoro Occidental DEO, Region IV-B. Reported contract value: ₱9,554,927.71. Status: Reported complete (DPWH). Contractor on record: SOSEP BUILDERS. Figures trace to dpwh.

Mindoro Occidental DEO, Region IV-B
Region: Region IV-B

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱50,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-18-0018857 · ₱8,639,025 · release to the district office, not itemized per project

    Possible match · score 0.80

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,554,928 · SOSEP BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-22 → 2025-10-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF STANDARD 2STY-4CL SCHOOL BUILDIING (BATCH 3), TANYAG NHS, CALINTAAN, OCCIDENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Anahawin River Flood Control Structures, Phase 1, Calintaan, Occidental Mindoro
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-18-0018857

₱8,639,025.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

18EB0180-R1 Civil Works

₱9,554,927.71 · SOSEP BUILDERS

Award / contract ref: 18EB0180-R1

4. Implementation

Contract Amount

₱9,554,927.71

Progress

Reported complete (DPWH)

Start Date

January 3, 2019

Target End

July 1, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOccidental MindoroCalintaanTanyag
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.