Buildings and Facilities17DQ0095

PROPOSED CONSTRUCTION OF (4) STOREY (8) CLASSROOM AT REAL ELEMENTARY SCHOOL, BACOOR, CAVITE

PROPOSED CONSTRUCTION OF (4) STOREY (8) CLASSROOM AT REAL ELEMENTARY SCHOOL, BACOOR, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱21,323,270.12. Status: Reported complete (DPWH). Contractor on record: D. Figures trace to dpwh.

Cavite 3rd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0025300 · ₱5,300,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DQ0095 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-08-10 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱2,665,409 per classroom= 1.2x the Region IV-A median (n=665)

Contract cost ₱21,323,270 ÷ 8 classroom read from the DPWH title (“(8) CLASSROOM”; classroom count in title). National percentile: 86. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PROPOSED CONSTRUCTION OF (4) STOREY (8) CLASSROOM AT REAL ELEMENTARY SCHOOL, BACOOR, CAVITE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control in Taguilid River, Brgy. Marulas Section, Kawit, Cavite
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0025300

₱5,300,000.00 · FY2017

Released to Regional Office - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

11 projects · ₱171.0M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOLBUILDING AT BAYANAN ELEMENTARY SCHOOL, BACOOR, CAVITE

Cavite 3rd DEO, Region IV-A

2017₱30.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS ALONG

Cavite 3rd DEO, Region IV-A

2021₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF THREE (3) STOREY NINE (9) CLASSROOM SCHOOL BUILDING AT BACOOR NHS GEORGETOWN, BACOOR CITY CAVITE

Cavite 3rd DEO, Region IV-A

2017₱24.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDINGAT GOV P. F. ESPIRITU ELEMENTARY SCHOOL, BACOOR, CAVITE

Cavite 3rd DEO, Region IV-A

2017₱21.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE ALONG CAVITE-

Cavite 3rd DEO, Region IV-A

2021₱11.8M
Reported complete (DPWH)
No sat.

CLUSTER 2019LIP-02: CONSTRUCITON OF VARIOUS CONCRETE ROADS: A) CONCT. OF RD LEADING TO TALABAAN ELEM SCHOOL PROPER, BRGY. TALABAAN, MAMBURAO, B) CONCT OF RD BRGY. 4, MAMBURAO, C) CONCT. OF RD BRGY.7, MAMBURAO, D) CONCT. OF RD, SITIO MAASIM, BRGY.9, MAMBUR

Mindoro Occidental DEO, Region IV-B

2019₱9.5M
Reported complete (DPWH)
View all 11 projects →

4. Implementation

Contract Amount

₱21,323,270.12

Progress

Reported complete (DPWH)

Start Date

November 29, 2017

Target End

July 26, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “PROPOSED CONSTRUCTION OF (4) STOREY (8) CLASSROOM AT REAL ELEMENTARY SCHOOL, BACOOR, CAVITE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/a6c3d542-5125-405e-8ab1-39323558c978

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteCity of BacoorReal
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.