Buildings and Facilities23AA0402

CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, BARANGAY 20 SAN MIGUEL, LAOAG CITY, ILOCOS NORTE

CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, BARANGAY 20 SAN MIGUEL, LAOAG CITY, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱4,836,107.50. Status: Past target date (DPWH On-Going). Contractor on record: AJ TAYLAN CONST CORP. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱45,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23AA0402 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    78% reported · imagery 2019-02-06 → 2019-02-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, BARANGAY 20 SAN MIGUEL, LAOAG CITY, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Daurao Creek, Barangay Casili, Laoag City, Ilocos Norte
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Ilocos Norte 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

48 projects · ₱1.3B total · 0 flags

Other projects by this contractor

View all 48 projects →

4. Implementation

Contract Amount

₱4,836,107.50

Progress

Past target date (DPWH On-Going)

Start Date

June 9, 2023

Target End

October 6, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, BARANGAY 20 SAN MIGUEL, LAOAG CITY, ILOCOS NORTE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/a7b1a650-7a09-486f-805a-f30584f6c0d8

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteCity of LaoagBgy. No. 20, San Miguel
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.