Bridges17FM0002

REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT) CLEMENTE BRIDGE (B00002TC) ALONG SAN FERNANDO SOUTH ROAD (PHASE II), SAN FERNANDO, MASBATE.

REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT) CLEMENTE BRIDGE (B00002TC) ALONG SAN FERNANDO SOUTH ROAD (PHASE II), SAN FERNANDO, MASBATE. is a DPWH-tracked public work in Masbate 1st DEO, Region V. Reported contract value: ₱18,522,256.38. Status: Reported complete (DPWH). Contractor on record: LEGAZPI PREMIUM DEVELOPMENT CORP. Figures trace to dpwh.

Masbate 1st DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱7,500 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0012978 · · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FM0002 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-05-21 → 2025-10-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT) CLEMENTE BRIDGE (B00002TC) ALONG SAN FERNANDO SOUTH ROAD (PHASE II), SAN FERNANDO, MASBATE.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱7,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures (Dike) along Panisihan River, Batuan, Masbate
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0012978

₱-25,012,500.00 · FY2017

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

83 projects · ₱7.0B total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS_ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BALOGO SPORTS COMPLEX) SORSOGON OLYMPIC VILLAGE, BALOGO, SORSOGON CITY

Sorsogon DEO, Region V

2022₱293.8M
Reported complete (DPWH)
No sat.

MFO3-MAINTENANCE & CONSTRUCTION SERVICE OF OTHER INFRASTRUCTURE,CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS,TO A.DECLARED TOURISM DESTINATIONS, ROAD IMPROVEMENT OF MATNOG-STA. MAGDALENA-BULUSAN

Region V, Region V

2016₱289.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW-SORSOGON CITY COASTAL BY-PASS ROAD INCL. ROW AND BRIDGE, ROAD: STA.0+000-STA.1+796.60 (W/ EXCEPTION);STA.0+007.19-STA.0+225.33(ACCESS ROAD);BRIDGE:STA.0+525.70-STA.0+586.30(BY-PASS BRIDGE 1),STA.1+7

Region V, Region V

2017₱281.4M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT CONSTRUCTION OF BY-PASS/DIVERSION ROADS, INCLUDING ROW SORSOGON CITY COASTAL BYPASS ROAD, STA. 0+893.00 - STA. 1+935, SORSOGON 1ST LD

Region V, Region V

2016₱266.3M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, ROLANDO A. ANDAYA HIGHWAY, K0327+000-K0338+000 INTERMITTENT SECTION (LUPI-SIPOCOT SECTION), CAMARINES SUR

Region V, Region V

2018₱241.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD INCLUDING SLOPE PROTECTION STRUCTURE ALONG J

Sorsogon DEO, Region V

2023₱190.8M
Reported complete (DPWH)
View all 83 projects →

4. Implementation

Contract Amount

₱18,522,256.38

Progress

Reported complete (DPWH)

Start Date

March 22, 2017

Target End

June 19, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateSan FernandoResurreccion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.