CONST./MAINTENANCE OF FLOOD MITIGATON STRUCTURES AND DRAINAGE SYSTEMS LAUR RIVER FLOOD CONTROL,LAUR,NUEVA ECIJA 3RD LD,STA 0+000 TO STA.0+197.60
CONST./MAINTENANCE OF FLOOD MITIGATON STRUCTURES AND DRAINAGE SYSTEMS LAUR RIVER FLOOD CONTROL,LAUR,NUEVA ECIJA 3RD LD,STA 0+000 TO STA.0+197.60 is a DPWH-tracked public work in Nueva Ecija 2nd DEO, Region III. Reported contract value: ₱18,620,003.82. Status: Reported complete (DPWH). Contractor on record: REBCOR CONST AND TRADING CORP. Figures trace to dpwh.
DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.
No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.