REBCOR CONST AND TRADING CORP is listed as a company organization in Philippine public procurement records on this site, with 38 linked DPWH project(s) totaling about ₱1,929,846,633.11. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
REBCOR CONST AND TRADING CORP
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 38
- Total value
- ₱1,929,846,633.11
- Published flags
- 0
- Region
- Nueva Ecija 2nd DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for REBCOR CONST AND TRADING CORP — not an accusation or finding of wrongdoing.
Score: 85.80 / 100 · Projects in sample: 38 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 81/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 81
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 34
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 38
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 38
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 38
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 38
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 38
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
31 geotagged project(s) — Open full map
- CONSTRUCTION OF TAGAYTAY FLYOVER, BRGY. MENDEZ - CROSSING EAST JUNCTION, TAGAYTAY CITY K0061+416 - K0062+01623D00160 · ₱564,252,734.43 · mapped
- BRIDGE PROGRAM-CONSTRUCTION OF NEW PERMANENT BRIDGES-GENERAL LUNA BRIDGE (BO1324LZ) ALONG DAANG MAHARLIKA (LZ), NUEVA ECIJA 3RD LEGISLATIVE DISTRICT, CABANATUAN CITY18C00030 · ₱139,923,692.78 · mapped
- BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, SICSICAN BRIDGE (BO1963LZ) ALONG DAANG MAHARLIKA (LZ), NUEVA ECIJA 1ST LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA18C00028 · ₱122,214,283.84 · mapped
- BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, SICSICAN BRIDGE (BO1936LZ) ALONG DAANG MAHARLIKA (LZ)-PHASE II, NUEVA ECIJA 1ST LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA19C00005 · ₱111,587,901.28 · mapped
- GENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), GENERAL AGUINALDO, CAVITE22D00004 · ₱96,490,950.77 · mapped
- BRIDGE PROGRAM-CONSTRUCTION OF NEW PERMANENT BRIDGES-GENERAL LUNA BRIDGE (PARALLEL BRIDGE) ALONG DAANG MAHARLIKA (LZ)-PHASE II, NUEVA ECIJA 3RD LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA19C00008 · ₱94,766,292.06 · mapped
- CONSTRUCTION OF BRIDGE, BRGY. NAZARETH LEADING TO MINALUNGAO NATIONAL PARK, BRGY. RIO CHICO, GENERAL TINIO, NUEVA ECIJA18CF0154 · ₱94,569,396.89 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), MARAGONDON SECTION, CAVITE24D00051 · ₱93,899,168.23 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL BRIDGES, CONSTRUCTION OF RIO CHICO BRIDGE LEADING TO SITIO PANTAY AND BIGNAY, RIO CHICO, GENERAL TINIO, NUEVA ECIJA, STA. 0+000.00 -STA. 0+422.8017CF0165 · ₱82,390,179.04
- BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES-SAGANA BR. (B01346LZ) ALONG JCT. TABLANG - GABALDON RD25CF0143 · ₱65,068,191.66 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES DIBABUYAN BR. (B00114LZ), DAANG MAHARLIKA (LZ)17CE0033 · ₱55,862,363.96 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES, LOMBOY BR. 1 (B01964LZ) ALONG DAANG MAHARLIKA (LZ)18CE0137 · ₱41,921,485.08 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES TABUATING BRIDGE (B01313LZ) ALONG DAANG MAHARLIKA (LZ), SAN LEONARDO, NUEVA ECIJA17CF0144 · ₱40,322,538.52 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORT SEAPORTS AND DECLARED TOURISM, AQUINO BYWAY-MANILA ROAD (VIA SAN JOSE MALINO ANAO ROAD AND CALULUT LEADING TO DMIA ROUTE 1 INCLUDING BRIDGE REPLACEMENT, PAMPANGA17CG0172 · ₱32,018,650.00
- BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-SICSICAN BRIDGE (BO1963LZ)-PHASE III, NUEVA ECIJA 1ST LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA20C00014 · ₱30,638,880.83 · mapped
- NETWORK DEVELOPMENT PROGRAM (BRIDGE PROGRAM) WIDENING OF PERMANENT BRIDGE, MAMALACOL BRIDGE (B00143LZ), ALONG DAANG MAHARLIKHA (LZ)18CF0144 · ₱29,270,149.70 · mapped
- WIDENING OF PERMANENT BRIDGES INCLUDING ROW TO MORE THAN 2 LANES MINATULA BRIDGE (B00125LZ) ALONG DAANG MAHARLIKA (LZ)17CF0210 · ₱24,204,653.78 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES SAN JUAN BR. 3 (B00151LZ) ALONG JCT. TABLANG GABALDON ROAD.17CF0196 · ₱23,832,904.35 · mapped
- NETWORK DEVELOPMENT PROGRAM (BRIDGE PROGRAM) WIDENING OF PERMANENT BRIDGES, CINCO CINCO BR. (B00131LZ) ALONG STA. ROSA - TARLAC ROAD18CF0143 · ₱20,722,250.41 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES TO MORE THAN 2-LANES-PRIMARY ABOT BRIDGE (B001300LZ) ALONG STA. ROSA-TARLAC ROAD.17CF0166 · ₱20,505,370.15 · mapped
- CONST./MAINTENANCE OF FLOOD MITIGATON STRUCTURES AND DRAINAGE SYSTEMS LAUR RIVER FLOOD CONTROL,LAUR,NUEVA ECIJA 3RD LD,STA 0+000 TO STA.0+197.6016CF0019 · ₱18,620,003.82
- WIDENING OF PERMANENT BRIDGES INCLUDING ROW TO MORE THAN TWO LANES, BITAS BR. (B00128LZ) ALONG DAANG MAHARLIKA LZ17CF0204 · ₱16,646,311.91 · mapped
- NETWORK DEVELOPMENT PROGRAM (BRIDGE PROGRAM) WIDENING OF PERMANENT BRIDGES, SAPANG BUHAY BR. 1(B00126LZ) ALONG DAANG MAHARLIKHA (LZ)18CF0145 · ₱14,963,303.73 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES; MINULI BR. 2 (B01980LZ) ALONG DAANG MAHARLIKA (LZ)17CE0070 · ₱14,653,127.39 · mapped
- CONCRETING OF TAGPOS CENTRO ROAD, BRGY. TAGPOS, STA. ROSA, NUEVA ECIJA16CF0064 · ₱12,632,019.65
- WIDENING OF PERMANENT BRIDGES INCLUDING ROW TO MORE THAN 2 LANES, CAALIBANGBANGAN BRIDGE (B00126LZ) ALONG DAANG MAHARLIKA (LZ)17CF0251 · ₱11,406,314.40
- CONST. AND MAINT. OF BRIDGES ALONG NATIONAL ROADS REHAB./MAJOR REPAIR OF PERMANENT BRIDGE BANGKEROHAN BRIDGE,(BO0135LZ) ALONG NUEVA ECIJA ROAD,PALAYAN CITY,NUEVA ECIJA15CF0187 · ₱9,307,233.20 · mapped
- CONCRETING OF SANTOLAN AULO FMR, PALAYAN CITY, NUEVA ECIJA16CF0063 · ₱6,758,130.76
- CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-PRIMARY MANICLA BR. (B01968LZ) ALONG DAANG MAHARLIKA (LZ)16CE0207 · ₱5,531,498.33 · mapped
- CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-SECONDARY,PORAIS BR. (B03401LZ) ALONG SAN JOSE CITY-RIZAL RD. VIA PINILI-PORAIS-VILLA JOSON-STA. MONICA-PORTAL RD.16CE0212 · ₱5,387,767.25 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, CURVA BR. (B00113LZ) ALONG NUEVA ECIJA-PANGASINAN ROAD16CE0043 · ₱5,137,955.83 · mapped
- CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-PRIMARY SIBUL BR. (B01281LZ) ALONG SN. JOSE-LUPAO RD.16CE0236 · ₱4,495,857.57 · mapped
- LOCAL PROGRAM - CONSTRUCTION OF LOCAL BRIDGE, BRGY. TALABUTAB SUR, GENERAL NATIVIDAD, NUEVA ECIJA18CF0140 · ₱4,351,395.68 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES SUMACAB BR. (B01339LZ) ALONG SUMACAB - SN JOSEF - BONIFACIO RD20CF0025 · ₱3,888,548.41 · mapped
- CONST. AND MAINT. OF BRIDGES ALONG NATIONAL ROADS REHAB./MAJOR REPAIR OF PERMANENT BRIDGE SEGUM BRIDGE 2,(B01351LZ) ALONG JCT,TABLANG GABALDON ROAD,LAUR,NUEVA ECIJA15CF0190 · ₱3,721,032.56 · mapped
- CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-SECONDARY,SANCHEZ BR. (B03398LZ) ALONG SAN JOSE CITY - RIZAL RD. VIA PINILI-PORAIS-VILLA JOSON-STA. MONICA-PORTAL RD.16CE0235 · ₱3,535,795.26 · mapped
- CONCRETING OF BRGY. RIO CHICO FMR, BRGY. RIO CHICO, GEN. TINIO, NUEVA ECIJA17CF0149 · ₱2,925,034.95
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES CINCO-CINCO BR. 2 (B01333LZ) ALONG CABANATUAN CITY - CARMEN RD.20CF0026 · ₱1,423,264.65 · mapped
