Flood Control and Drainage15HI0114No coordinates published by DPWH

CONSTRUCTION OF FLOOD CONTROL & DRAINAGE FACILITY ALONG CEBU NORTH HAGNAYA WHARF ROAD, LILOAN, CEBU (K0017+830 - K0018+170). LILOAN, CEBU

CONSTRUCTION OF FLOOD CONTROL & DRAINAGE FACILITY ALONG CEBU NORTH HAGNAYA WHARF ROAD, LILOAN, CEBU (K0017+830 - K0018+170). LILOAN, CEBU is a DPWH-tracked public work in Cebu 5th DEO, Region VII. Reported contract value: ₱18,185,000.00. Status: Reported complete (DPWH). Contractor on record: PLD CONST AND DEVELOPMENT INC FORMERLY: PLD CONST. Figures trace to dpwh.

Cebu 5th DEO, Region VII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2016 · ₱20,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-16-0000086 · ₱99,240 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15HI0114 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL & DRAINAGE FACILITY ALONG CEBU NORTH HAGNAYA WHARF ROAD, LILOAN, CEBU (K0017+830 - K0018+170). LILOAN, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control And Drainage Facility along Cebu North - Hagnaya Wharf Road, Compostela (K0021+800 - K0023+000)
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-16-0000086

₱99,240.00 · FY2016

Released to 000 - Office of the Executive Director (Central Office) To (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

230 projects · ₱5.3B total · 0 flags

Other projects by this contractor

CONST. OF FLOOD CONTROL STRUCTURE ALONG MARANDING RIVER, INCL. ROW, PACKAGE 6, LANAO DEL NORTE

Region X, Region X

2024₱157.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (LABANGON PUBLIC MARKET), BRGY. LABANGON, CEBU CITY, CEBU

Region VII, Region VII

2023₱140.6M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (LANAO CULTURAL CENTER), KAPATAGAN NATIONAL HIGH SCHOOL, BARANGAY POBLACION, KAPATAGAN, LANO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2022₱118.2M
Reported complete (DPWH)
No sat.

CLUSTER G PREVENTIVE MAINTENANCE OF VARIOUS ROAD PROJECTS IN LANAO DEL NORTE1) MALABANG-DOBLESTON-TUKURAN RD - K1974 + 000 - K1975 + 300 =PHP62,465,415.002) MALABANG-DOBLESTON-TUKURAN RD - K1975 + 300 - K1977 + 560

Region X, Region X

2024₱114.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH RD) - K0111+006.00 - K0111+912.00 AND K0113+905.00 - K0114+433.00

Cebu 2nd DEO, Region VII

2023₱98.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

PREVENTIVE MAINTENANCE ALONG LINAMON-ZAMBOANGA ROAD K1550+334-K1552+981, BACOLOD, LANAO DEL NORTE

Lanao del Norte 1st DEO, Region X

2021₱96.5M
Reported complete (DPWH)
View all 230 projects →

4. Implementation

Contract Amount

₱18,185,000.00

Progress

Reported complete (DPWH)

Start Date

March 14, 2016

Target End

November 8, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)Cebu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.