Buildings and Facilities25FD0041

CLUSTER 6: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUPI, RAGAY AND SIPOCOT, CAMARINES SUR

CLUSTER 6: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUPI, RAGAY AND SIPOCOT, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 1st DEO, Region V. Reported contract value: ₱12,170,767.17. Status: Past target date (DPWH On-Going). Contractor on record: ADSL CONST. Figures trace to dpwh.

Camarines Sur 1st DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25FD0041 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    94% reported · imagery 2020-04-07 → 2025-04-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER 6: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUPI, RAGAY AND SIPOCOT, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Brgy Port Junction Norte, Ragay, Camarines Sur
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Camarines Sur 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

F

101 projects · ₱5.0B total · 0 flags

Other projects by this contractor

No sat.

CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN-BRGY. GENERAL ESCO, NAUJAN, OR. MINDORO

Region IV-B, Region IV-B

2025₱137.9M
Past target date (DPWH On-Going)
No sat.

CONST./MAINT. OF FLOOD MITIGATION SRTRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PJHASE 2, BRGY. MULAWIMN, NAUJAN, ORINTAL MINORO

Region IV-B, Region IV-B

2025₱137.9M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱133.7M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱133.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 6, SAN ILDEFON

Region III, Region III

2024₱133.0M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 7, SAN ILDEFON

Region III, Region III

2024₱128.3M
Ongoing (DPWH-reported)
View all 101 projects →

4. Implementation

Contract Amount

₱12,170,767.17

Progress

Past target date (DPWH On-Going)

Start Date

March 27, 2025

Target End

October 4, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurRagayApad
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.