Flood Control and Drainage19K00470

REPAIR/REHABILITATION OF FLOOD CONTROL DIKE ALONG CAGAYAN DE ORO RIVER (CALA-CALA - TIBASAK - MACASANDIG), CAGAYAN DE ORO CITY, STA. 7+740.00 TO STA. 7+960.00

REPAIR/REHABILITATION OF FLOOD CONTROL DIKE ALONG CAGAYAN DE ORO RIVER (CALA-CALA - TIBASAK - MACASANDIG), CAGAYAN DE ORO CITY, STA. 7+740.00 TO STA. 7+960.00 is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱29,332,856.23. Status: Reported complete (DPWH). Contractor on record: TRIPARCO DEVELOPMENT CORP. Figures trace to dpwh.

Region X, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱29,332,856 · TRIPARCO DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-11 → 2020-03-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (dike / levee)

₱133,331 per linear m= 0.9x the national median (n=75)

Contract cost ₱29,332,856 ÷ 220 linear m read from the DPWH title (“STA. 7+740.00 TO STA. 7+960.00”; station range length (Sta. a+b to c+d)). National percentile: 39. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Misamis Oriental

Based on the coordinates published with the DPWH record and NOAH file MisamisOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPAIR/REHABILITATION OF FLOOD CONTROL DIKE ALONG CAGAYAN DE ORO RIVER (CALA-CALA - TIBASAK - MACASANDIG), CAGAYAN DE ORO CITY, STA. 7+740.00 TO STA. 7+960.00

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

19K00470

₱29,332,856.23 · TRIPARCO DEVELOPMENT CORP

Award / contract ref: 19K00470

Contractor

B

357 projects · ₱29.2B total · 4 flags

Other projects by this contractor

View all 357 projects →

4. Implementation

Contract Amount

₱29,332,856.23

Progress

Reported complete (DPWH)

Start Date

July 13, 2020

Target End

January 16, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)City of Cagayan De OroMacasandig
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.