Bridges19CG0198

CONSTRUCTION OF BRIDGE AT DOLORES, BACOLOR, PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT)

CONSTRUCTION OF BRIDGE AT DOLORES, BACOLOR, PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT) is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱56,832,517.00. Status: Reported complete (DPWH). Contractor on record: ADVANCED FOUNDATION CONST SYSTEMS CORP. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROII-19-0008831 · ₱269,451 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19CG0198 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-08 → 2025-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BRIDGE AT DOLORES, BACOLOR, PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROII-19-0008831

₱269,451.00 · FY2019

Released to Veterans General Hospital (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

39 projects · ₱5.6B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: NAGUILIAN BRIDGE ALONG DAANG MAHARLIKA (LZ)(PARALLEL BRIDGE)

Region II, Region II

2020₱969.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA

Region II, Region II

2019₱542.4M
Past target date (DPWH On-Going)
No sat.

LOCALLY FUNDED PROJECTS: ONSTRUCTION/ REHAB./ IMPV'T OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, ROADS AND BRIDGES- LOCAL BRIDGES: CONST'N OF PIGALO BRIDGE & APPROACHES ALONG ALICIA-ANGADANAN-SAN GUILLERMO PROVINCIAL ROAD, ANGADANAN, ISABELA

Region II, Region II

2016₱437.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MINANGA BRIDGE (B01129LZ) ALONG DAANG MAHARLIKA (LZ) (PARALLEL BRIDGE), TUMAUINI, ISABELA

Region II, Region II

2020₱374.5M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM :CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), CAGAYAN

Region II, Region II

2022₱347.2M
Reported complete (DPWH)

WIDENING OF BRIDGE - SIBALOM BR. (B00123PN) ALONG ILOILO - ANTIQUE RD

Region VI, Region VI

2019₱259.4M
Reported complete (DPWH)
View all 39 projects →

4. Implementation

Contract Amount

₱56,832,517.00

Progress

Reported complete (DPWH)

Start Date

October 23, 2019

Target End

June 18, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaBacolorDolores
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.