Roads16PG0014No coordinates published by DPWH

CONSTRUCTION/IMPROVEMENT/REHABILITATION OF BARANGAY PUGO-BOLOG FMR

CONSTRUCTION/IMPROVEMENT/REHABILITATION OF BARANGAY PUGO-BOLOG FMR is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱1,921,522.17. Status: Reported complete (DPWH). Contractor on record: BUGANI CONST AND ENT INC. Figures trace to dpwh.

Ifugao 1st DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-BMB-A-16-0003828 · · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16PG0014 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT/REHABILITATION OF BARANGAY PUGO-BOLOG FMR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-16-0003828

₱-11,176,723,257.00 · FY2016

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

23 projects · ₱290.6M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BANAUE - HUNGDUAN - BENGUET BDRY ROAD, K0347+750 -K0347+783, K0

Cordillera Administrative Region, Cordillera Administrative Region

2017₱60.5M
Reported complete (DPWH)
No sat.

OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG NUEVA VIZCAYA-IFUGAO-MT. PROVINCE BOUNDARY ROAD

Ifugao 1st DEO, Cordillera Administrative Region

2017₱39.8M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE ALONG KIANGAN-TINOC-BUGUIAS ROAD, KIANGAN, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2017₱35.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION OF CUDOG-MUNGAYANG-KIANGAN ROAD LEADING TO AMBUAYA LAKE, YAMASHITA SHRINE AND KIYANGAN SETTLEMENT, KIANGAN AND LAGAWE, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2017₱32.4M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG JCT. POTIA - MT. PROVINCE BDRY ROAD, - K0434+395 - K0438+444, K0439+800 - K0447+1

Ifugao 2nd DEO, Cordillera Administrative Region

2017₱24.9M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) ALONG BANAUE-HUNGDUAN-BENGUET BOUNDARY ROAD, K0365+288-K0365+365, K0366+427-K0366+680, K0375+824-K0376+116, K0384+(-508)-K0365+(-458), CHAINAGE 8385-CHAINAGE 8477, HUNGDUAN AND TINOC, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2017₱24.1M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱1,921,522.17

Progress

Reported complete (DPWH)

Start Date

July 13, 2016

Target End

August 18, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION/IMPROVEMENT/REHABILITATION OF BARANGAY PUGO-BOLOG FMR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/c531ba56-6993-4729-a988-143ae7f6c478

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Ifugao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.