Construction of Drainage Structure23DO0062

Construction of Drainage System, Brgy. Halayhayin, Pililla, Rizal

Construction of Drainage System, Brgy. Halayhayin, Pililla, Rizal is a DPWH-tracked public work in PILILLA (RIZAL), RIZAL, Region IV-A. Reported contract value: ₱4,950,000.00. Status: Reported complete (DPWH). Contractor on record: GKB BUILDERS. Figures trace to sumbong.

PILILLA (RIZAL), RIZAL, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱20,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23DO0062 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-13 → 2024-08-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Rizal

Based on the coordinates published with the DPWH record and NOAH file Rizal.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Drainage System, Brgy. Halayhayin, Pililla, Rizal

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Dau Creek, Brgy. San Luis, Antipolo City, Rizal
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Rizal 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Possible match · 75%

Construction Project

₱70,000.00 · GKB BUILDERS

Possible match · 75%

Construction of Roadway Lightings at Leon Amiana S

₱6,336,587.16 · GKB BUILDERS

Possible match · 71%

Canal with Cover at Pugala Road

₱197,834.44 · GKB BUILDERS

Contractor

B

22 projects · ₱175.6M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SAN MATEO - RODRIGUEZ ROAD - K0023+100 - K0024+000

Rizal 2nd DEO, Region IV-A

2022₱23.5M
Reported complete (DPWH)
No sat.

Construction of Slope Protection Structure along Sakayin Creek at Sitio Namay, Sitio Caingin, and Sitio Wawa, Barangay San Juan, Morong, Rizal

MORONG (RIZAL), RIZAL, Region IV-A

2024₱14.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT UNIVERSITY OF RIZAL SYSTEM (URS), BARANGAY SAN JOSE, ROD.....

Rizal 2nd DEO, Region IV-A

2022₱14.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MANILA EAST ROAD - K0049+592 - K0050+281 BARAS, RIZAL

Rizal 2nd DEO, Region IV-A

2021₱14.2M
Reported complete (DPWH)
No sat.

CONCRETING OF SITIO PULKUM TO SITIO MAY-UGAT, BRGY. LAGUNDI FMR, BRGY. LAGUNDI MORONG, RIZAL

Rizal 2nd DEO, Region IV-A

2024₱9.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NAGSULO, CARDONA, RIZAL

Rizal 2nd DEO, Region IV-A

2024₱9.9M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱4,950,000.00

Progress

Reported complete (DPWH)

Start Date

May 8, 2023

Target End

August 12, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)RizalPilillaBagumbayan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.