Buildings and Facilities21HB0166

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF EVACUATION CENTER (PHASE 2) IN ANDA, BOHOL

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF EVACUATION CENTER (PHASE 2) IN ANDA, BOHOL is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱9,898,573.38. Status: Reported complete (DPWH). Contractor on record: MUANA CONST AND DEVELOPMENT CORP FORMERLY. Figures trace to dpwh.

Bohol 3rd DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱9,785,520 · MUAÑA CONSTRUCTION AND DEVELOPMENT .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-09 → 2025-07-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF EVACUATION CENTER (PHASE 2) IN ANDA, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures and Drainage System, Poblacion, Candijay, Bohol
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Bohol 3rd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21HB0166

₱9,785,520.03 · MUAÑA CONSTRUCTION AND DEVELOPMENT .

Award / contract ref: 21HB0166 (ReAd)

Contractor

B

261 projects · ₱5.3B total · 0 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCTURE ALONG GABAYAN RIVER, CANDIJAY, BOHOL, STA. 0+600.00 - STA. 1+068.00, S

Bohol 3rd DEO, Region VII

2025₱144.7M
Past target date (DPWH On-Going)

Construction of Tumuran - Sarangani River Control, Phase II, Candijay, Bohol

CANDIJAY (BOHOL), BOHOL, Region VII

2024₱144.6M
Reported complete (DPWH)
No sat.

CSSP, CONST./IMPROVEMENT OF VARIOUS INFRA IN SUPPORT OF NATIONAL SECURITY(TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAN AT SEGURIDAD PROGRAM-TIKAS), REHAB. OF 47TH INFANTRY (K) BATTALION HEADQUARTERS-CAMP RAJAH SIKATUNA (PHASE 1),BRGY.KATIPUNAN, CARMEN, BOHOL

Region VII, Region VII

2025₱141.9M
Past target date (DPWH On-Going)
No sat.

CSSP, CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAN AT SEGURIDAD PROGRAM-TIKAS), REHAB. OF 47TH INFANTRY (K) BATTALION HEADQUARTERS-CAMP RAJAH SIKATUNA (PHASE 2), BRGY. KATIPUNAN,

Region VII, Region VII

2025₱141.9M
Past target date (DPWH On-Going)

Construction of Wahig River Control Structure, Pamacsalan Area, Pilar, Bohol

PILAR (BOHOL), BOHOL, Region VII

2024₱130.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), BRGY. POBLACION, CANDIJAY, BOHOL

Bohol 3rd DEO, Region VII

2023₱99.0M
Reported complete (DPWH)
View all 261 projects →

4. Implementation

Contract Amount

₱9,898,573.38

Progress

Reported complete (DPWH)

Start Date

August 16, 2021

Target End

April 2, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholAndaPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.