Buildings and Facilities17KH0074

CONSTRUCTION OF CLASSROOMS: 2STY4CL - IPONAN ES, BRGY. IPONAN, CAGAYAN DE ORO CITY

CONSTRUCTION OF CLASSROOMS: 2STY4CL - IPONAN ES, BRGY. IPONAN, CAGAYAN DE ORO CITY is a DPWH-tracked public work in Cagayan de Oro City 1st DEO, Region X. Reported contract value: ₱8,772,491.86. Status: Reported complete (DPWH). Contractor on record: H. Figures trace to dpwh.

Cagayan de Oro City 1st DEO, Region X
Region: Region X

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱31,510

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0010836 · ₱277,253 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱8,772,492 · H & N BUILDERS AND ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-04-08 → 2020-03-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱2,193,123 per classroom= 1.2x the Region X median (n=280)

Contract cost ₱8,772,492 ÷ 4 classroom read from the DPWH title (“2STY4CL”; classroom count in title). National percentile: 66. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CLASSROOMS: 2STY4CL - IPONAN ES, BRGY. IPONAN, CAGAYAN DE ORO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱31,510,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Iponan Flood Control Project (downstream), Bulua Side, Iponan Bridge III, Sta. 0+550 - Sta. 0+660, Cagayan de Oro City
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0010836

₱277,253.00 · FY2017

Released to Salvacion National High School - Bato (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Contract ID 17KH0074

₱8,772,491.86 · H & N BUILDERS AND ENTERPRISES

Award / contract ref: Contract ID: 17KH0074

Contractor

B

60 projects · ₱437.1M total · 0 flags

4. Implementation

Contract Amount

₱8,772,491.86

Progress

Reported complete (DPWH)

Start Date

January 15, 2018

Target End

July 21, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)City of Cagayan De OroIponan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.