Roads15BD0141No coordinates published by DPWH

ROAD CONCRETING OF LOCAL ROAD (COMPLETION) BRGY. ALITUNGTUNG, AMULUNG, CAG.

ROAD CONCRETING OF LOCAL ROAD (COMPLETION) BRGY. ALITUNGTUNG, AMULUNG, CAG. is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱995,414.23. Status: Reported complete (DPWH). Contractor on record: REYROSE CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region II

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-16-0012658 · ₱3,968,267 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱995,414 · REYROSE CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD CONCRETING OF LOCAL ROAD (COMPLETION) BRGY. ALITUNGTUNG, AMULUNG, CAG.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Flood Control Structure (gabion with steel sheet piles), Dugayong, Amulung, Cagayan 3rd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-16-0012658

₱3,968,267.00 · FY2016

Released to Soccsksargen Centers for Health Development To (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Road Concreting of Local Road (Completion)

₱995,414.23 · REYROSE CONSTRUCTION

Award / contract ref: 15BD0141

4. Implementation

Contract Amount

₱995,414.23

Progress

Reported complete (DPWH)

Start Date

March 8, 2016

Target End

May 6, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “ROAD CONCRETING OF LOCAL ROAD (COMPLETION) BRGY. ALITUNGTUNG, AMULUNG, CAG..” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/cf88953f-20c9-4ffd-8c06-f774c136b962

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanAmulung
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.