Roads17BI0074

CONCRETING OF NUEVA VIZCAYA EXPERIMENT STATION ROAD NETWORK (PHASE III) BRGY. VILLAROS, BAGABAG, NUEVA VIZCAYA

CONCRETING OF NUEVA VIZCAYA EXPERIMENT STATION ROAD NETWORK (PHASE III) BRGY. VILLAROS, BAGABAG, NUEVA VIZCAYA is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱4,775,500.00. Status: Reported complete (DPWH). Contractor on record: MONTE CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-17-0018967 · ₱105,598 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱4,775,500 · MONTE CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-04-22 → 2024-08-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF NUEVA VIZCAYA EXPERIMENT STATION ROAD NETWORK (PHASE III) BRGY. VILLAROS, BAGABAG, NUEVA VIZCAYA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project along Apian River protecting Jct. Lamo-Malasin Road (Barangay Lamo Section), Dupax del Norte, Nueva Vizcaya
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-17-0018967

₱105,598.00 · FY2017

Released to Anao National High Fu School (7 (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Concreting of Nueva Vizcaya Experiment Station Roa

₱4,775,500.00 · MONTE CONSTRUCTION & SUPPLY

Award / contract ref: 17BI0074

Contractor

A

27 projects · ₱286.3M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUCT

Nueva Vizcaya DEO, Region II

2020₱33.7M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS PAPAYA MALABING WANGAL BINUGAWAN TADJI RUNRUNO RD K0312 +300 K0313+535

Nueva Vizcaya DEO, Region II

2024₱24.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF JACINTO ESQUI

Nueva Vizcaya DEO, Region II

2023₱19.6M
Reported complete (DPWH)
No sat.

ORGANIZATION OUTCOME 2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WIT

Nueva Vizcaya DEO, Region II

2019₱19.6M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROAD, PAPAYA MALABING WANGAL BINUGAWAN - TADJI RUNRUNO ROAD, K0314+208, RUNRUNO, QUEZON, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2023₱19.3M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE TERTIARY ROAD, BAMBANG-KASIBU-QUEZON-SOLANO ROAD, K0330+650, DARUBBA, QUEZON, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2023₱19.3M
Reported complete (DPWH)
View all 27 projects →

4. Implementation

Contract Amount

₱4,775,500.00

Progress

Reported complete (DPWH)

Start Date

August 7, 2017

Target End

October 5, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaBagabagVillaros
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.