Water Provision and Storage22LE0089

CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) STAINLESS STEEL HORIZONTAL TANK, ERNESTO V. BAUTISTA ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL; HILARIO K. CERNAL ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL; MALAGSOM ELEMENTARY SCHOOL, MALITA

CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) STAINLESS STEEL HORIZONTAL TANK, ERNESTO V. BAUTISTA ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL; HILARIO K. CERNAL ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL; MALAGSOM ELEMENTARY SCHOOL, MALITA is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱4,424,392.33. Status: Reported complete (DPWH). Contractor on record: FORTSTONE CONST ENT. Figures trace to dpwh.

Davao Occidental DEO, Region XI
Region: Region XI

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱50,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱4,424,392 · FORTSTONE CONSTRUCTION ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-08-07 → 2025-09-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) STAINLESS STEEL HORIZONTAL TANK, ERNESTO V. BAUTISTA ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL; HILARIO K. CERNAL ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL;  MALAGSOM ELEMENTARY SCHOOL, MALITA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Concrete Revetment, Pongpong Flood Control (RC Cut-off Wall), Sta. Maria, Davao Occidental
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Davao Occidental DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CID NO. 22LE0089 CONSTRUCTION OF RAINWATER COLLECT

₱4,424,392.33 · FORTSTONE CONSTRUCTION ENTERPRISES

Award / contract ref: 22LE0089

4. Implementation

Contract Amount

₱4,424,392.33

Progress

Reported complete (DPWH)

Start Date

November 10, 2022

Target End

December 24, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) STAINLESS STEEL HORIZONTAL TANK, ERNESTO V. BAUTISTA ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL; HILARIO K. CERNAL ELEMENTARY SCHOOL, STA. MARIA, DAVAO OCCIDENTAL; MALAGSOM ELEMENTARY SCHOOL, MALITA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/dc6bcd88-c97c-4a57-8674-f921b2746812

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OccidentalSanta MariaSan Roque
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.