CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY

CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY is a DPWH-tracked public work in South Cotabato 1st DEO, Region XII. Reported contract value: ₱9,899,956.55. Status: Past target date (DPWH On-Going). Contractor on record: FUENTABUILT CONST CORP. Figures trace to dpwh.

South Cotabato 1st DEO, Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.77

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱9,602,916 · FUENTABUILT CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    96% reported · imagery 2019-05-15 → 2019-05-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PUROK LOWER MALAKAS, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 77%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Balite River Flood Control Structure, Barangay M. Adriatico, Gloria, Oriental Mindoro
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

South Cotabato 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25MB0020 - Construction of Road with Drainage Stru

₱9,602,916.35 · FUENTABUILT CONSTRUCTION

Contractor

A

211 projects · ₱1.8B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOM 4 STOREY 20 CL AT FATIMA NATIONAL SCHOOL, BRGY. FATIMA, GENERAL SANTOS CITY (2UNITS)

South Cotabato 1st DEO, Region XII

2016₱64.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES REHABILITATION OF MULTI-PURPOSE BUILDING, CANDIJAY, BOHOL

Bohol 3rd DEO, Region VII

2023₱61.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS- JCT. (TER)-JAGNA-SIERRA BULLONES RD - K0069 + 661 - K

Bohol 3rd DEO, Region VII

2022₱58.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD PROTECTION ALONG JCT. (TER) GUINDULMAN - ANDA - BADIANG - COGTONG ROAD, ANDA, BOHOL STA. 20+4

Bohol 3rd DEO, Region VII

2021₱53.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS-JCT (TER)-JAGNA-SIERRA BULLONES RD - K0082 + 678 - K0

Bohol 3rd DEO, Region VII

2022₱49.6M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LOAY INTERIOR ROAD-K0167+337 - K0168+839

Bohol 3rd DEO, Region VII

2024₱48.8M
Reported complete (DPWH)
View all 211 projects →

4. Implementation

Contract Amount

₱9,899,956.55

Progress

Past target date (DPWH On-Going)

Start Date

April 7, 2025

Target End

November 12, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)City of General SantosSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.