CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO
CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱96,009,778.32. Status: Past target date (DPWH On-Going). Contractor on record: ROBETH CONST AND DEV'T CORP FORMERLY: ROBETH GEN MDSE CONST & SUPPLY. Figures trace to dpwh.
Total Contract Cost
