Flood Control and Drainage17PD0029No coordinates published by DPWH

LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF SEWERLINE PUROK 1, LUALHATI, BAGUIO CITY, BENGUET

LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF SEWERLINE PUROK 1, LUALHATI, BAGUIO CITY, BENGUET is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱1,928,596.24. Status: Reported complete (DPWH). Contractor on record: CAD-ERA DESIGN AND BUILDER. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Cordillera Administrative Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱2,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROX-17-0025803 · ₱6,505,000 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,928,596 · CAD-ERA DESIGN AND BUILDER

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-12-23 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF SEWERLINE PUROK 1, LUALHATI, BAGUIO CITY, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Sagudin River, Brookside, Baguio City, Benguet
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROX-17-0025803

₱6,505,000.00 · FY2017

Released to Northern Mindanao Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱1,928,596.24 · CAD-ERA DESIGN AND BUILDER

Award / contract ref: 17PD0029

Contractor

B

10 projects · ₱150.6M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF EVACUATION CENTER AT LIWAN WEST, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2021₱35.7M
Reported complete (DPWH)
No sat.

NATIONAL BUILDING PROGRAM - MULTIPURPOSE/FACILITIES-STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND EVACUATION CENTERS/QUARANTINE FACILITIES - CAR CONSTRUCTION OF EVACUATION CENTER AT UBAO, AGUINALDO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2021₱35.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING AT ALEJO PACALSO MEMORIAL HIGH SCHOOL, TUDING, ITOGON, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS 1.HYDRO. #3, NANGALISAN, TUBA 2. PENGED, NANGALISAN, TUBA, 3. CAMP 6, DPWH-TOLLGATE, TUBA 4. CAMP 4 DPWH-FIELD CAMP, TUBA, 5. COLORADO FALLS, TWIN PEAKS, TUBA 6.TWIN

Cordillera Administrative Region, Cordillera Administrative Region

2018₱17.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, ASIN PROPER-LUCEB SECTION, TUBA, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2020₱16.4M
Reported complete (DPWH)
No sat.

BASIC EDUCATION FACILITIES FUND (BEFF) BATCH 13-CONSTRUCTION OF 4-STOREY, 8 CLASSROOMS, QUEZON HILL NATIONAL HIGH SCHOOL, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2017₱11.4M
Reported complete (DPWH)
View all 10 projects →

4. Implementation

Contract Amount

₱1,928,596.24

Progress

Reported complete (DPWH)

Start Date

April 18, 2017

Target End

May 23, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of Baguio
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.