Buildings and Facilities17FC0179No coordinates published by DPWH

CONST. OF TWO (2) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BLDG., MORENO IHS (ANNEX), DA

CONST. OF TWO (2) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BLDG., MORENO IHS (ANNEX), DA is a DPWH-tracked public work in Camarines Norte DEO, Region V. Reported contract value: ₱35,689,500.81. Status: Reported complete (DPWH). Contractor on record: SPRING STAR CONST AND SUPPLY. Figures trace to dpwh.

Camarines Norte DEO, Region V

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region V

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱1,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-16-0027986 · ₱243,341 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FC0179 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,487,063 per classroom= 0.7x the Region V median (n=157)

Contract cost ₱35,689,501 ÷ 24 classroom read from the DPWH title (“TWELVE (12) CLASSROOM”; classroom count in title x 2 units). National percentile: 39. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF TWO (2) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BLDG., MORENO IHS (ANNEX), DA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱1,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Repair of Flood Control of Brgy. Poblacion Sur, Paracale, Camarines Norte
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-16-0027986

₱243,341.00 · FY2016

Released to Division of Sorsogon (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

225 projects · ₱6.8B total · 2 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BALUD NATIONAL ROAD CONNECTING BARANG

Masbate 2nd DEO, Region V

2023₱135.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - C0NSTRUCTION/IMPROVEMENT OF ACCESS OF ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - BALUD - PALANI - PANUBIGAN - PAJO -TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGA

Masbate 2nd DEO, Region V

2023₱115.8M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA ROAD, MASBATE, STA.5+101 - STA.6+245, AROROY, MASBATE

Masbate 2nd DEO, Region V

2022₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MANDAON - DAYHAGAN ROAD, PACKAGE 1, MASBATE

Masbate 2nd DEO, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MANDAON - DAYHAGAN - ROAD, STA.4+350 - STA.5+750, MANDAON, MASBATE

Masbate 2nd DEO, Region V

2022₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA ROAD, MASBATE, STA. 3+892 - STA. 5+052, NET LENGTH = 2.320 LANE KM (1.160 KM), AROROY, MASBATE

Masbate 2nd DEO, Region V

2021₱96.5M
Reported complete (DPWH)
View all 225 projects →

4. Implementation

Contract Amount

₱35,689,500.81

Progress

Reported complete (DPWH)

Start Date

December 3, 2017

Target End

August 29, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines Norte
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.