Water Provision and Storage25HB0150

CONVERGENCE AND SPECIAL SUPPORT PROGRAM RAINWATER COLLECTOR SYSTEM1.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BATUAN TOURISM BUILDING, POBLACION SUR, BATUAN, BOHOL PHP 362,571.432.CONSTRUCTION OF RAIN COLLECTION SYSTEM (RWCS), IPO ELEMEN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM RAINWATER COLLECTOR SYSTEM1.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BATUAN TOURISM BUILDING, POBLACION SUR, BATUAN, BOHOL PHP 362,571.432.CONSTRUCTION OF RAIN COLLECTION SYSTEM (RWCS), IPO ELEMEN is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱2,461,860.00. Status: Reported complete (DPWH). Contractor on record: JAS MIXER CONST AND DEVELOPMENT CORP. Figures trace to dpwh.

Bohol 3rd DEO, Region VII
Region: Region VII

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Protection Dike, Cahayag CIS, Tubigon, Bohol
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Bohol 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

33 projects · ₱895.3M total · 0 flags

Other projects by this contractor

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASBU RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA. 0+03

Bohol 3rd DEO, Region VII

2024₱144.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING ALONG JCT. (TER) JAGNA - SIERRA BULLONES ROAD, K0063+478 - K0070

Bohol 3rd DEO, Region VII

2024₱98.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS- JCT (TER)-JAGNA-SIERRA BULLONES RD - K0069 + 760 - K0

Bohol 3rd DEO, Region VII

2022₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-REHABILITATION/ RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, LOAY INTERIOR ROAD, LOBOC, BOHOL KO190+150 -KO190+247.20, KO

Bohol 3rd DEO, Region VII

2022₱58.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - TAGBILARAN EAST RD (TAGB.-JAGNA) K0210+620 - K0210+7

Bohol 3rd DEO, Region VII

2022₱49.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS BALILIHAN-HANOPOL-BATUAN RD - K0040 + (-493.50) - K

Bohol 3rd DEO, Region VII

2023₱43.1M
Reported complete (DPWH)
View all 33 projects →

4. Implementation

Contract Amount

₱2,461,860.00

Progress

Reported complete (DPWH)

Start Date

June 30, 2025

Target End

October 12, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.