Flood Control and Drainage19MC0079

CONSTRUCTION OF REVETMENT- CONSTRUCTION REVETMENT ALONG MARBEL RIVER (STA. 3+690-STA. 3+960, LEFT BANK, MATALAM, COTABATO

CONSTRUCTION OF REVETMENT- CONSTRUCTION REVETMENT ALONG MARBEL RIVER (STA. 3+690-STA. 3+960, LEFT BANK, MATALAM, COTABATO is a DPWH-tracked public work in Cotabato 2nd DEO, Region XII. Reported contract value: ₱44,098,000.00. Status: Reported complete (DPWH). Contractor on record: JARGON CONST. Figures trace to dpwh.

Cotabato 2nd DEO, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROXII-19-0013780 · ₱1,040,524 · release to the district office, not itemized per project

    Possible match · score 0.80

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19MC0079 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-08-14 → 2025-09-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱163,326 per linear m= 1.3x the Region XII median (n=25)

Contract cost ₱44,098,000 ÷ 270 linear m read from the DPWH title (“STA. 3+690-STA. 3+960”; station range length (Sta. a+b to c+d)). National percentile: 61. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cotabato

Based on the coordinates published with the DPWH record and NOAH file Cotabato.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF REVETMENT- CONSTRUCTION REVETMENT ALONG MARBEL RIVER (STA. 3+690-STA. 3+960, LEFT BANK, MATALAM, COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-19-0013780

₱1,040,524.00 · FY2019

Released to Division of South (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

397 projects · ₱12.9B total · 0 flags

4. Implementation

Contract Amount

₱44,098,000.00

Progress

Reported complete (DPWH)

Start Date

July 18, 2019

Target End

March 8, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)CotabatoMatalamMarbel
Storms whose wind field reached it
Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.