Construction of Drainage Structure22CI0089

Construction of Drainage Canal along Arayat Magalang Mabalacat Road

Construction of Drainage Canal along Arayat Magalang Mabalacat Road is a DPWH-tracked public work in MABALACAT CITY (PAMPANGA), PAMPANGA, Region III. Reported contract value: ₱14,680,755.80. Status: Reported complete (DPWH). Contractor on record: NES-SAN BUILDERS. Figures trace to sumbong.

MABALACAT CITY (PAMPANGA), PAMPANGA, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱40,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0001629 · ₱159,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22CI0089 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-10-29 → 2025-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Pampanga

Based on the coordinates published with the DPWH record and NOAH file Pampanga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Drainage Canal along Arayat Magalang Mabalacat Road

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Mitigation Structure along Sapang Are Creek, Apalit, Pampanga
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0001629

₱159,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0012252

₱1,104,074.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0002420

₱749,061.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002914

₱723,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0004169

₱110,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0002421

₱71,763.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0005826

₱46,080.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0010260

₱254,906.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

69 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROADS AND DRAINAGE AT ANGELES CITY, PAMPANGA PHASE 4

Pampanga 3rd DEO, Region III

2025₱81.0M
Past target date (DPWH On-Going)
No sat.

Construction of Slope Protection Works at Maasim River, Phase I (Tributary Of Pampanga River) barangay Pulong Gubat, Candaba, Pampanga

CANDABA (PAMPANGA), PAMPANGA, Region III

2023₱70.2M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ARAYAT - MAGALANG (ARAYAT SECTION) BYPASS ROAD, PAMPANGA

Pampanga 1st DEO, Region III

2020₱46.9M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MAIN ROAD (LAPUT - CONCEPCION ROAD INCLUDING DRAINAGE SYSTEM), ME

Pampanga 1st DEO, Region III

2025₱46.8M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING (TERTIARY ROADS) CANDABA - SAN MIGUEL ROAD K0073+408 - K0073+674; K0074+000 TO K0075+753, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2018₱43.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF STA. ANA - SAN LUIS ROAD, SAN JOSE - STA. MARIA, STA. ANA, PAMPANGA

Pampanga 1st DEO, Region III

2024₱38.4M
Reported complete (DPWH)
View all 69 projects →

4. Implementation

Contract Amount

₱14,680,755.80

Progress

Reported complete (DPWH)

Start Date

March 24, 2022

Target End

August 20, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaMabalacat CityParalayunan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.