CLUSTER IV - CONSTRUCTION OF RAINWATER COLLECTOR (RWCS) AT MOBO, MASBATE; A. TUGBO INTEGRATED SCHOOL (ANNEX CAMPUS), MOBO, MASBATE; B. TUGBO INTEGRATED SCHOOL (MAIN CAMPUS), MOBO, MASBATE; C. DACU ES, MOBO, MASBATE
CLUSTER IV - CONSTRUCTION OF RAINWATER COLLECTOR (RWCS) AT MOBO, MASBATE; A. TUGBO INTEGRATED SCHOOL (ANNEX CAMPUS), MOBO, MASBATE; B. TUGBO INTEGRATED SCHOOL (MAIN CAMPUS), MOBO, MASBATE; C. DACU ES, MOBO, MASBATE is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱924,949.84. Status: Reported complete (DPWH). Contractor on record: 3R3M CONST AND SUPPLY CORP FORMERLY: 3R3M CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost