Roads19MG0090

CONCRETING OF ROAD AT BALMORES STREET TO NATIONAL HIGHWAY, BRGY. MORALES, KORONADAL CITY

CONCRETING OF ROAD AT BALMORES STREET TO NATIONAL HIGHWAY, BRGY. MORALES, KORONADAL CITY is a DPWH-tracked public work in South Cotabato 2nd DEO, Region XII. Reported contract value: ₱29,008,980.48. Status: Reported complete (DPWH). Contractor on record: GABRIELLAS ENT. Figures trace to dpwh.

South Cotabato 2nd DEO, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-CAR-19-0019827 · ₱5,063,000 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19MG0090 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-02-13 → 2025-11-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF ROAD AT BALMORES STREET TO NATIONAL HIGHWAY, BRGY. MORALES, KORONADAL CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-CAR-19-0019827

₱5,063,000.00 · FY2019

Released to Far North Luzon General Per Hospital and Training Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

28 projects · ₱652.4M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT, AND CORN INDUSTRIES, STA 6+100 - STA.7+120 (ROAD COMPONENT); STA 5+78

Region XII, Region XII

2023₱135.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF CONCRETE ROAD - NRJ TO SITIO SEWAL LEADING TO LAGBASAN CAVE PASSING THRU BURIAL CAVE, STA. 7+503-STA. 9+583, BRGY. KUDEN, SEN. NINOY AQUINO, SULTAN KUDARAT

Region XII, Region XII

2023₱122.1M
Reported complete (DPWH)
No sat.

CLUSTER I-CONSTRUCTION OF CONCRETE ROAD A.JCT. SURALLAH-LAKE SEBU ROAD LEADING TO NV VOGT SOLAR POWER PLANT, BRGY. CENTRALA, SURALLAH,SOUTH COTABATO B.BRGY. SAN JOSE PROPER-SITIO BOUNDARY-PUROK APOSTOL-TINAGO ROAD IN SUPPORT OF AGRI-PROCESSING ACTIVITIES

South Cotabato 2nd DEO, Region XII

2022₱43.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD-ROAD FROM JUNCTION LAKE SEBU TO VILLA ELLAGA-LAMBUSONG ROAD LINKING PROVINCIAL ROAD IN SUPPORT OF PINEAPPLE, PALM OIL, CORN,BANANA, CASSAVA AND SUGARCANE AT BARANGAY COLONGULO TO PACKAGING AND PROCESSING CENTERS, SURALLAH, SO

South Cotabato 2nd DEO, Region XII

2021₱40.1M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. UPPER SEPAKA PROPER TO SITIO LUBOL FMR, BRGY. UPPER SEPAKA, SURALLAH, SOUTH COTABATO

South Cotabato 2nd DEO, Region XII

2021₱39.8M
Reported complete (DPWH)
No sat.

ROAD WIDENING-ALONG COTABATO-MARBEL RD (S00276MN) K1753+000-K1754+495

South Cotabato 2nd DEO, Region XII

2022₱38.2M
Reported complete (DPWH)
View all 28 projects →

4. Implementation

Contract Amount

₱29,008,980.48

Progress

Reported complete (DPWH)

Start Date

July 5, 2019

Target End

January 10, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)South CotabatoCity of KoronadalMorales
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.