Roads15PD0046No coordinates published by DPWH

LOCAL INFRASTRUCTURE PROGRAM-ROAD WIDENING AT BALSIGAN, BAGUIO CITY LONE DISTRICT

LOCAL INFRASTRUCTURE PROGRAM-ROAD WIDENING AT BALSIGAN, BAGUIO CITY LONE DISTRICT is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱1,909,072.35. Status: Reported complete (DPWH). Contractor on record: ICO CONST SERVICES. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Cordillera Administrative Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2016 · ₱2,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0011713 · ₱60,921,463 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,909,072 · ICO CONSTRUCTION SERVICES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2011-11-30 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-ROAD WIDENING AT BALSIGAN, BAGUIO CITY LONE DISTRICT

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control (Slope Protection) at Brookside, Baguio City Lone District
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0011713

₱60,921,463.00 · FY2016

Released to Western Visayas Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱1,909,072.35 · ICO CONSTRUCTION SERVICES

Award / contract ref: 15PD0046

Contractor

B

26 projects · ₱104.3M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION, NATONIN-TOBOY ROAD IN SUPPORT OF ABACA, BANANA, CACAO,CORN AND TOURISM INDUSTRIES, NATONIN, MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2020₱14.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE BAGUIO-ITOGON ROAD, K0262+090 - K0262+112, K0262+540 - K0262+585, K0263+418 - K0263+448, K0265+150 - K0265+175, ITOGON, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2021₱11.7M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. STO. TOMAS STRAWBERRY AREA FMR, BRGY. STO. TOMAS, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2021₱11.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION, NATONIN-TOBOY ROAD IN SUPPORT OF ABACA,BANANA, CACAO, CORN AND TOURISM INDUSTRIES, NATONIN, MT. PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2021₱9.7M
Reported complete (DPWH)
No sat.

REH. OF DISASTER-REL INFRA AND OTHER FACILITIES-IMPLEM. OF CALAMITY-RELATED PROJS IN BAGUIO CITY WHICH WERE DAMAGED BY TY VINTA, URDUJA, MARING, AMANG, HABAGAT, USMAN AND OMPONG IN 2017 AND 2018: REST. OF ROADSLIP AND OTHER REL STRUCT ALONG LUCNAB RD.

Baguio City DEO, Cordillera Administrative Region

2019₱6.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, ASOKONG BRIDGE SECTION, KABAYAN, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2020₱6.3M
Reported complete (DPWH)
View all 26 projects →

4. Implementation

Contract Amount

₱1,909,072.35

Progress

Reported complete (DPWH)

Start Date

February 26, 2016

Target End

April 1, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of Baguio
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.