Construction of Slope Protection Structure along Camiling River (Packaqe B - Right Bank), Sawat - Bilad Section, Camiling, Tarlac
Construction of Slope Protection Structure along Camiling River (Packaqe B - Right Bank), Sawat - Bilad Section, Camiling, Tarlac is a DPWH-tracked public work in CAMILING (TARLAC), TARLAC, Region III. Reported contract value: ₱93,605,000.00. Status: Reported complete (DPWH). Contractor on record: ROYAL CROWN MONARCH CONST & SUPPLIES CORP. Figures trace to sumbong.
Total Contract Cost






