ROYAL CROWN MONARCH CONST & SUPPLIES CORP is listed as a company organization in Philippine public procurement records on this site, with 58 linked DPWH project(s) totaling about ₱5,118,272,716.60. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
ROYAL CROWN MONARCH CONST & SUPPLIES CORP
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 58
- Total value
- ₱5,118,272,716.60
- Published flags
- 17
- Region
- TARLAC · Region III
Online presence
Google Maps: Royal Crown Monarch Construction and Supplies Corporation★ 2.2 (5 reviews)Google Maps, 2026-10-22
GH95+8WX, Tarlac City, Tarlac
Public Record Grade
A transparent, data-derived summary of reported public records for ROYAL CROWN MONARCH CONST & SUPPLIES CORP — not an accusation or finding of wrongdoing.
Score: 94.30 / 100 · Projects in sample: 58 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 98.3/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 98.3
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 56
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 58
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 58
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 58
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 93.3/100 · Weight: 11%
- projects
- 58
- componentScore
- 93.3
- flagsPerProject
- 0.22
- publishedV2Flags
- 13
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 58
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 58 geotagged projects (largest by contract value) — Open full map
- Construction of Slope Protection with Steel Sheet Pile Foundation along Camiling River (Right Bank), Baybayaoas-Telbang Section (Package R), Tarlac23C00065 · ₱144,749,856.70 · mapped
- Construction of Flood Control Structure along Rio Chico River (Segment K), Victoria, Tarlac24CJ0010 · ₱99,000,000.00 · mapped
- Construction of Flood Control Structure along Rio Chico River (Segment L), Victoria, Tarlac24CJ0013 · ₱99,000,000.00 · mapped
- Construction of Camiling River Left Bank, Anoling 3rd to Pao 1st Section Package A, Camiling, Tarlac23CJ0005 · ₱96,500,000.00 · mapped
- Construction of Camiling River Left Bank, Anoling 3rd to Pao 1st Section Package B, Camiling, Tarlac23CJ0009 · ₱96,500,000.00 · mapped
- Construction of Slope Protection Structure Along Camiling River Right Bank, Surgui 1st - Cacamilingan Sur Section (Package C), Camiling, Tarlac22CJ0188 · ₱96,500,000.00 · mapped
- Construction of Camiling River Left Bank, Anoling 3rd to Pao 1st Section Package C, Camiling, Tarlac23CJ0010 · ₱96,500,000.00 · mapped
- Construction of Slope Protection Structure along Camiling River, Poblacion D to G Section (Package C), Camiling, Tarlac22CJ0193 · ₱96,500,000.00 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation Along Camiling River Right Bank, Baybayaoas - Telbang Section (Package Q), Tarlac23CJ0070 · ₱96,500,000.00 · mapped
- Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 1, Sta. 1+080.00 to Sta. 1+451.91, Capas, Tarlac.24CK0036 · ₱96,500,000.00 · mapped
- Construction of Camiling River Right Bank, Baybayaoas - Telbang Section (Package P), Tarlac23CJ0056 · ₱96,500,000.00 · mapped
- Construction of Flood Control Structure along San Jose River (Bigte-Ipo Dam Road), San Jose Del Monte City, Bulacan24CD0057 · ₱96,498,767.65 · mapped
- Construction of Dike along Santo Cristo River, Barangay Santo Cristo, San Jose del Monte City, Bulacan24CD0079 · ₱96,498,484.30 · mapped
- Construction of Flood Control Structure along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road San Jose River, San Jose Del Monte City, Bulacan23CD0062 · ₱96,498,410.90 · mapped
- Construction of Dike along Santo Cristo River, Barangay Dulong Bayan, San Jose del Monte City, Bulacan24CD0077 · ₱96,498,309.12 · mapped
- Construction of Flood Control Structure, San Jose River, San Jose Del Monte City, Bulacan24CD0054 · ₱96,498,249.74 · mapped
- Construction of Flood Control Structure, San Jose River, San Jose Del Monte City, Bulacan23CD0067 · ₱96,498,078.58 · mapped
- Rehabilitation of Existing Dike along Lucung River (Café Section, Right Bank), Phase 1, Concepcion, Tarlac24CK0069 · ₱96,497,825.29 · mapped
- Rehabilitation of Existing Dike along Lucung River (Magao Section, Right Bank), Package F, Concepcion, Tarlac24CK0072 · ₱96,497,823.04 · mapped
- Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 2, Sta. 1+451.91 to Sta. 1+823.05, Capas, Tarlac24CK0037 · ₱96,497,531.14 · mapped
- Rehabilitation of Existing Dike along Rio Chico River, (Balanoy Section, Right Bank), Phase 1, Sta. (-)5+130 to Sta. (-)5+594.31, La Paz, Tarlac24CK0048 · ₱96,497,236.09 · mapped
- Construction of Existing Dike Along Rio Chico River (Bantog Section, Right Bank, Landslide), Package 3 La Paz, Tarlac23CK0050 · ₱96,497,151.81 · mapped
- Rehabilitation of Dike along O'Donnell River, (Barangay Sta. Juliana Section, Right Bank), Phase 1, Sta. 5+382.00 to Sta. 5+874.80, Capas, Tarlac24CK0032 · ₱96,497,009.70 · mapped
- Construction of Flood Control Structure, Panaklayan, Barangay Graceville to Barangay Gaya-gaya, City of San Jose del Monte, Bulacan22CD0209 · ₱96,496,179.81 · mapped
- Rehabilitation of Dike along O'Donnell River, (Downstream of Palublub Bridge, Left Bank), Phase 3, Sta. 0 + 991.76 to Sta. 1 + 489.18, Capas, Tarlac24CK0035 · ₱96,492,882.96 · mapped
- Construction of Slope Protection, Hulo-Kaban, Brgy. Kaypian, City of San Jose del Monte, Bulacan22CD0207 · ₱96,455,909.00 · mapped
- Rehabilitation of Dike along O'Donnell River (Brgy. Sta. Juliana Section, Right Bank), Capas, Tarlac22CK0105 · ₱96,011,740.90 · mapped
- Construction of Slope Protection Structure with Steel Sheet Pile Foundation Along Delinquente Creek, Bacabac Section (Package B), Camiling, Tarlac22CJ0113 · ₱94,859,500.09 · mapped
- Construction of Flood Control Structure, San Jose River, San Jose Del Monte City, Bulacan22CD0054 · ₱94,569,849.55 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF MANILA NORTH ROAD TO PCWR VIA SAPANG BURGOS, PANIQUI, TARLAC22CJ0217 · ₱94,556,146.76 · mapped
- Rehabilitation of Dike along Rio Chico River, Downstream of Rio Chico Bridge, Sta.0+943.75 to Sta.1+349.75 (Brgy. San Roque Section, Right Bank), La Paz, Tarlac22CK0100 · ₱94,547,166.18 · mapped
- ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG BAMBAN POBLACION ROAD, BAMBAN, TARLAC22CK0039 · ₱94,544,426.75 · mapped
- Rehabilitation of Dike along Parua River, Sta.6+675 to Sta.7+119 (Brgy. San Francisco Section, Left Bank), Concepcion, Tarlac22CK0097 · ₱94,533,425.98 · mapped
- Rehabilitation of Dike along Lucung River, Sta. (-)6+ 690 to Sta. (-)6+310 (Brgy. San Rafael Section, Right Bank), Bamban, Tarlac22CK0101 · ₱94,489,688.90 · mapped
- Rehabilitation of Dike along Bangut River (Brgy. Sta. Lucia Section, Sta.1+082.80 to Sta.1+640 - Right Bank), Capas, Tarlac22CK0084 · ₱94,481,613.13 · mapped
- Construction of Camiling-Agno River Floodway Phase 2, Tarlac22CJ0172 · ₱94,473,500.00 · mapped
- Construction of Flood Control Structure, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road San Jose River, San Jose Del Monte City, Bulacan22CD0004 · ₱94,174,761.35 · mapped
- Construction of Flood Control Structure Along Rio Chico River (Phase V), Victoria, Tarlac23CJ0025 · ₱93,605,792.49 · mapped
- Construction of Flood Control Structure along Masalasa Creek (Phase II), Tarlac City, Tarlac23CJ0046 · ₱93,605,343.32 · mapped
- Construction of Slope Protection Structure along Tarlac River Control Left Dike, Tibagan-Tibag-Section Package C, Tarlac Citv, Tarlac22CJ0185 · ₱93,605,000.00 · mapped
- Construction of Slope Protection Structure Along Camiling River Right Bank, Surgui 1st - Cacamilingan Sur Section (Package B), Camiling, Tarlac22CJ0187 · ₱93,605,000.00 · mapped
- Construction of Slope Protection Structure along Tarlac River Control Left Dike, Tibagan-Tibag-Section Package B, Tarlac Citv, Tarlac22CJ0184 · ₱93,605,000.00 · mapped
- Construction of Slope Protection Structure along Camiling River (Packaqe B - Right Bank), Sawat - Bilad Section, Camiling, Tarlac22CJ0186 · ₱93,605,000.00 · mapped
- Rehabilitation of Eroded Pampanga River Bank at Lacquioz, Arayat, Pampanga24CG0003 · ₱93,604,758.63 · mapped
- Improvement of Canal System and Service Road of PDRIS, Sta. Ana, Pampanga22CG0147 · ₱93,122,497.85 · mapped
- Construction of Flood Control Structure along O'Donnell River Control, Moriones - Balanti Section (Section D), Tarlac24CJ0088 · ₱92,954,070.00 · mapped
- Construction of Flood Control Structure along Rio Chico River (Section C), Victoria, Tarlac24CJ0004 · ₱92,954,070.00 · mapped
- Construction of Flood Control Structure Along Moriones River Left Bank, Tibagan Section (Phase III), Tibagan, Tarlac City, Tarlac23CJ0004 · ₱70,203,779.61 · mapped
- Construction of Flood Control Structure along Inerangan River, Segment 14, Ramos, Tarlac25CJ0038 · ₱70,167,867.76 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation Along Delinquente Creek, Bacabac Section (Package M), Barangay Bacabac, Camiling, Tarlac23CJ0017 · ₱62,715,307.43 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
