| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF GUARDWALL ALONG BASCO- MAHATAO- IVANA- UYUGAN- IMNAJBU ROAD, IVANA, BATANES | Batanes DEO | ₱48.9M | 93% reported progress | DEKM CONST | 177 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SEA WALL AT IVANA SHELTER PORT, IVANA, BATANES | Batanes DEO | ₱39.1M | 99% reported progress | J F GABOTERO INC | 181 | Check in |
| Construction of Guardwall along Uyugan-Mahatao Interior Rd, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱37.6M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 179 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM; CONSTRUCTION OF GUARDWALL ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN RD, SABTANG, BATANES | Batanes DEO | ₱35.3M | 92% reported progress | J F GABOTERO INC | 184 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM; CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF GUARDWALL ALONG MAYAN-MAUYEN PORT ROAD, ITBAYAT, BATANES | Batanes DEO | ₱35.2M | 95% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 137 | Check in |
| Construction of Uyugan Seawall, Brgy. Kayuganan Uyugan, Batanes | BATANES | ₱31.2M | Reported complete | ST TIMOTHY CONST CORP | 183 | Check in |
| CONSTRUCTION OF IVANA SEAWALL, IVANA, BATANES | Batanes DEO | ₱29.6M | Reported complete | A P B CONST | 180 | Check in |
| Construction of Guardwall along Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd (S00016BN) - K0005 + 010 - K0005 + 090, K0015 + 452 - K0015 + 783, Ivana, Batanes | IVANA (BATANES), BATANES | ₱29.4M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 174 | Check in |
| Construction of Guardwall along Uyugan-Mahatao Interior (S00017BN), K0032 + 088 - K0032 + 119, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱29.3M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 176 | Check in |
| Construction of Guardwall along Uyugan-Mahatao Interior (S00017BN) - K0029 + 501 - K0029 + 626, K0029 + 792 - K0029 + 850, K0029 + 935 - K0030 + 095, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱28.8M | Reported complete | J I ESPINO CONST | 178 | Check in |
| Construction (Completion) of Basco Seawall and Fishing Boat Shelter Basco, Barangay San Antonio, Basco, Batanes | BATANES | ₱27.2M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 172 | Check in |
| Rehabilitation of San Antonio Flood Control, Brgy. San Antonio Basco, Batanes | BATANES | ₱24.9M | Reported complete | ST TIMOTHY CONST CORP | 171 | Check in |
| Construction of Guardwall (along Basco-Mahatao-Ivana-Uyugan-Imnajbu Road), Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱24.1M | Reported complete | J F GABOTERO INC | 183 | Check in |
| IMPROVEMENT OF IVANA SEAWALL AND BOAT SHELTER PORT | Batanes DEO | ₱23.3M | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 181 | Check in |
| CONSTRUCTION OF GUARD WALL ALONG SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD | Batanes DEO | ₱23.3M | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 184 | Check in |
| CONSTRUCTION OF GUARDWALL ALONG BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU ROAD (S000016BN)-K0006+510-K0006+536.00, K0008+624.00-K0008+754.00, K0008+817.40-K0008+854.00, K0008+875.6-K0008+946.50, K0016+340.00-K0016+380.00, K0016+840.00-K0017+573.30, K0024+770 | Batanes DEO | ₱22.4M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 180 | Check in |
| CONSTRUCTION OF SEAWALL ALONG SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD (S00003ST),STA. 17+53.00-STA. 17+358.00, BRGY. NAKANMUAN, SABTANG, BATANES | Batanes DEO | ₱22.3M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 186 | Check in |
| Construction of Nakanmuan Seawall, Barangay Nakanmuan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱21.2M | Reported complete | J F GABOTERO INC | 184 | Check in |
| CONSTRUCTION OF SAN VICENTE SABTANG SEAWALL AND SHORE PROTECTION WALL (PACKAGE 1) | Batanes DEO | ₱20.2M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 185 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF SONGSONG FLOOD CONTROL STRUCTURE,BARANGAY KAYVALUGANAN,UYUGAN, BATANES | Batanes DEO | ₱19.6M | 96% reported progress | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 182 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST: MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DICHOD SECTION, BARANGAY KAYUGANAN, UYUGAN, BATANES | Batanes DEO | ₱19.6M | 81% reported progress | J F GABOTERO INC | 182 | Check in |
| ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS:FLOOD MANAGEMENT PROGRAM:CONTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF SHORE PROTECTION STRUCTURES ALONG BASCO-ITBUD DIVERSION ROAD | Batanes DEO | ₱19.6M | 80% reported progress | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 181 | Check in |
| IMPROVEMENT OF IVANA FLOOD CONTROL/SEAWALL, IVANA, BATANES | Batanes DEO | ₱19.6M | Reported complete | E M CUERPO INC | 181 | Check in |
| CONSTRUCTION (COMPLETION) OF BASCO SEAWALL AND FISHING BOAT SHELTER | Batanes DEO | ₱19.3M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 172 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM:CONST./MAINT.OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONST.OF SHORE PROTECTION STRUCTURE ALONG BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU ROAD,KADPIDAN SECTION,IVANA,BATANES | Batanes DEO | ₱17.9M | 13% reported progress | DEKM CONST | 180 | Check in |
| CONSTRUCTION OF SAN VICENTE SABTANG SEAWALL AND SHORE PROTECTION WALL (PACKAGE 2), SABTANG, BATANES | Batanes DEO | ₱17.3M | Reported complete | HGW=3 ENGINEERING | 185 | Check in |
| Construction of Seawall (Busbusan), Barangay Hañib, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱16.4M | Reported complete | STRONGLANE BUILDERS AND TRADING CORP FORMERLY: STRONGLANE CONST & TRADING | 175 | Check in |
| CONSTRUCTION/REHABILITATION OF MAHATAO FLOOD CONTROL STA.0+000-STA.0+146, MAHATAO, BATANES | Batanes DEO | ₱15.8M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 175 | Check in |
| CONSTRUCTION OF GUARD WALL ALONG BASCO - MAHATAO - IVANA - UYUGAN - IMNAJBU ROAD AND UYUGAN - MAHATAO INTERIOR ROAD, BATAN ISLAND | Batanes DEO | ₱15.7M | Reported complete | WERR CORP INTERNATIONAL | 180 | Check in |
| RECONSTRUCTION OF CHAJAJAS FLOOD CONTROL, BRGY. CHANARIAN, BASCO, BATANES | Batanes DEO | ₱14.7M | Reported complete | R L PACANA'S CONST | 173 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE I, BARANGAY SUMNANGA, SABTANG, BATANES | Batanes DEO | ₱13.9M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 189 | Check in |
| BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES: CONSTRUCTION OF SEAWALL (PHASE I), BUSBUSAN CREEK TO LALAG CREEK, BARANGAY ITBUD, UYUGAN, BATANES | Batanes DEO | ₱9.9M | 90% reported progress | SWIFT DEVELOPMENT AND SUPPLIES CORP | 181 | Check in |
| Construction of Yasyas Flood Control (Phase II), Barangay Kaychanarianan, Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱9.8M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 172 | Check in |
| Construction of Uyugan Flood Control (Valugan Section) Phase 2, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 182 | Check in |
| Construction of Barangay Kayuganan Seawall, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 183 | Check in |
| Construction of Sumnanga Seawall, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 189 | Check in |
| CONSTRUCTION OF VAHANGSIEN-YAS YAS DRAINAGE SYSTEM (COVERED CANAL), BRGY. KAYHUVOKAN, BASCO, BATANES | Batanes DEO | ₱9.8M | Reported complete | R L PACANA'S CONST | 172 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION OF CHAHAMPUAY FLOOD CONTROL STRUCTURE, BARANGAY SAVIDUG, SABTANG, BATANES | Batanes DEO | ₱9.8M | 32% reported progress | HGW=3 ENGINEERING | 188 | Check in |
| Construction of Guardwall along Sn Vicente-Savidug-Chavayan-Sumananga-Nakanmuan Rd, K0018 + 000 - K0018 + 029, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱9.8M | Reported complete | J F GABOTERO INC | 185 | Check in |
| Construction of Itbud Seawall, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.7M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 181 | Check in |
| Construction of Uyugan Flood Control (Valugan Section), Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.7M | Reported complete | REMAR CONST | 182 | Check in |
| Construction of Songsong Flood Control, Kayvaluganan, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱9.7M | Reported complete | MJMARI BUILDERS AND DEVELOPMENT CORP FORMERLY: MJMARI BUILDERS AND ENT | 182 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS;FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BARANGAY KAYVALUGANAN SEAWALL, UYUGAN, BATANES | Batanes DEO | ₱9.4M | Reported complete | REMAR CONST | 183 | Check in |
| Construction of Flood Control Savang-Aksung, Barangay Nakanmuan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱8.3M | Reported complete | CVAP CONST | 186 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF RETAINING WALL AT RADIWAN PORT, BARANGAY RADIWAN, IVANA, BATANES | Batanes DEO | ₱7.8M | 94% reported progress | DEKM CONST | 181 | Check in |
| Construction of Chariz Seawall (Phase II), Barangay Nakanmuan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱7.4M | Reported complete | JERIS CONST AND SUPPLY | 186 | Check in |
| Rehabilitation of Katuvang Seawall, Barangay Sumnanga, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱6.0M | Reported complete | CVAP CONST | 181 | Check in |
| Construction of Retaining Wall and Road Concreting of Diajan, Barangay San Antonio, Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱5.9M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 171 | Check in |
| Construction of Flood Control (Shoreline Protection) at Sitio Diptan, Barangay Sinakan, Sabtang, Batanes | SABTANG (BATANES), BATANES | ₱5.0M | Reported complete | BHM CONST | 185 | Check in |
| Construction of Flood Control (Sewerage Net/Screen) along Rayasan Bridge, Barangay Kaychanarianan, Basco, Batanes | BASCO (CAPITAL) (BATANES), BATANES | ₱4.9M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 172 | Check in |
| Construction of Retaining Wall, Sitio Ratay, Brgy. Itbud, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱4.9M | Reported complete | R L PACANA'S CONST & DEVELOPMENT | 181 | Check in |
| Construction of Diura Seawall, Sitio Diura, Barangay Uvoy, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱4.9M | Reported complete | DEKM CONST | 175 | Check in |
| Construction of Retaining Wall (Along Clemente Laurel Residence), Barangay Uvoy, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱4.9M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 175 | Check in |
| Construction of Retaining Wall at Joon St., Barangay Kaumbakan, Mahatao, Batanes | MAHATAO (BATANES), BATANES | ₱4.9M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 175 | Check in |
| Construction of Flood Control along Upper Creek at Sitio Lalag, Barangay Itbud, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱4.9M | Reported complete | REMAR CONST | 181 | Check in |
| CONSTRUCTION OF RETAINING WALL IN BRGY. STA ROSA (SITIO PIAVUYUGAN ALONG FMR RASAYAN TO KARAXPESAN), BRGY. STA. ROSA, ITBAYAT, BATANES | Batanes DEO | ₱4.9M | Reported complete | SWIFT DEVELOPMENT AND SUPPLIES CORP | 135 | Check in |
| Construction of Sayed Flood Control, Barangay Salagao, Ivana, Batanes | IVANA (BATANES), BATANES | ₱4.8M | Reported complete | REMAR CONST | 180 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL (STA. MARIA-CHALAN-ANAN) AT BRGY. KAYVALUGANAN, BASCO, BATANES | Batanes DEO | ₱4.7M | Reported complete | R L PACANA'S CONST | 171 | Check in |
| CONSTRUCTION OF RETAINING WALL (WITH BOX CULVERT), BRGY. SINAKAN, SABTANG, BATANES | Batanes DEO | ₱4.2M | Reported complete | ST TIMOTHY CONST CORP | 185 | Check in |
| Construction of Retaining Wall (Hillside) along Cabugao Road at Barangay Kayuganan, Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱4.1M | Reported complete | SWIFT DEVELOPMENT AND SUPPLIES CORP | 183 | Check in |
| CONSTRUCTION OF SEAWALL, BRGY. UVOY, MAHATAO, BATANES | Batanes DEO | ₱3.9M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 177 | Check in |
| REHABILITATION OF LALAG BOX CULVERT ALONG BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU ROAD-K0023+333 | Batanes DEO | ₱3.1M | Reported complete | MOJR CONST AND DEVELOPMENT CORP | 181 | Check in |
| CONSTRUCTION OF MAHATAO FLOOD CONTROL, BRGY. UVOY, MAHATAO, BATANES | Batanes DEO | ₱2.9M | Reported complete | RED MOLE CONST | 175 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL, BRGY. KAYCHANARIANAN, BASCO, BATANES | Batanes DEO | ₱2.9M | Reported complete | J I ESPINO CONST | 172 | Check in |
| Construction of Uyugan Flood Control (Dichod Section), Uyugan, Batanes | UYUGAN (BATANES), BATANES | ₱2.9M | Reported complete | REMAR CONST | 182 | Check in |
| REHABILITATION OF RETAINING WALL, BRGY. SAN ANTONIO, BASCO, BATANES | Batanes DEO | ₱2.9M | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 171 | Check in |
| CONSTRUCTION OF YAS-YAS CREEK WALL, BRGY. KAYCHANARIANAN, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 172 | Check in |
| CONSTRUCTION OF PADANGAN FLOOD CONTROL STRUCTURE, BRGY. KAYCHANARIAN, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 172 | Check in |
| CONST'N OF MOTCHONG PARK RETAINING WALL, UYUGAN, BATANES | Batanes DEO | ₱2.0M | Reported complete | L M CANLAS CONST | 182 | Check in |
| CONSTRUCTION OF DRAINAGE CANAL AT SITIO CHAVUAN, BRGY. SAN ANTONIO, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 171 | Check in |
| CONSTRUCTION OF DRAINAGE CANAL AT YAS-YAS I, BRGY. KAYCHANARIANAN, BASCO, BATANES | Batanes DEO | ₱2.0M | Reported complete | R L PACANA'S CONST | 172 | Check in |
| CONSTRUCTION OF CABUGAO FLOOD CONTROL, BRGY. POBLACION, UYUGAN, BATANES | Batanes DEO | ₱1.9M | Reported complete | R L PACANA'S CONST | 183 | Check in |
| CONSTRUCTION OF DRAINAGE SYSTEM, SITIO CHAVUAN,SAN ANTONIO, BASCO, BA | Batanes DEO | ₱1.9M | Reported complete | R L PACANA'S CONST | 171 | Check in |
| CONSTRUCTION OF LAVAK RETAINING WALL, BRGY. SINAKAN, SABTANG, BATANES | Batanes DEO | ₱1.5M | Reported complete | R L PACANA'S CONST | 185 | Check in |
| REHABILITATION OF BOX CULVERT, SITIO PIAVUYUGAN, BRGY. STA ROSA, ITBAYAT, BATANES | Batanes DEO | ₱986,993 | Reported complete | L M CANLAS CONST | 135 | Check in |
| CONSTRUCTION OF RETAINING WALL(BARSANA SOUTHWARD), RADIWAN, IVANA, BATANES | Batanes DEO | ₱947,332 | Reported complete | ST GERRARD CONST GEN CONTRACTOR | 180 | Check in |