Hon. Anna Victoria Veloso-Tuazon Representative, Leyte (Third District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Leyte (Third District) Dear Representative Anna Victoria Veloso-Tuazon: Good day. I live in Leyte (Third District), and I would like to ask about some DPWH lines for the Leyte 3rd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Br. Along Sambulawan JCT-Calaguise-Calubian Rd (Leyte 3rd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 585; no matching NEP line for this office] 2. Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Bridge (Parallel Bridge), along Sambulawan JCT -Calaguise-Calubian Road (Leyte 3rd DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 586; no matching NEP line for this office] 3. Construction of Villalon-Bunacan-Daja Road, (Sta. 3+324-3+925, Sta . 5+930-6+329), Calubian and San Isidro, Leyte (Leyte 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 585; no matching NEP line for this office] 4. Construction of Villanueva-Kawayanan Road, (Sta. 3=300-Sta. 4+300),Calubian, Leyte (Leyte 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 585; no matching NEP line for this office] 5. Construction of Basud-Cadaruhan-Maasin-Palid II Road, (Sta. 5+308-Sta. 6+308), San Isidro, Leyte (Leyte 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 585; no matching NEP line for this office] 6. Construction of JNR Consuegra-Wague-Butason Road, (Sta. 3+590-Sta. 4+590), Leyte and Tabango, Leyte (Leyte 3rd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 585; no matching NEP line for this office] 7. Construction of JNR bangkal-Sitio Alegria Road, (Sta. 0+775-Sta. 1+774(, Villaba, Leyte (Leyte 3rd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 585; no matching NEP line for this office] 8. Construction of Calbugos-Sitio Naga-Capiñahan Road, (Sta. 2+135-Sta.2+885), Villaba Leyte (Leyte 3rd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 586; no matching NEP line for this office] 9. Concreting of JNR Consuegra Consuegra-Tapol Road, (Sta. 1+680- 2+680), Leyte, Leyte (Leyte 3rd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 586; no matching NEP line for this office] 10. Concreting of Roads, Kawayanan Junction to Ruburan, Calubian, Leyte 11.453134, 124.381547 (Leyte 3rd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 586; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Leyte 3rd DEO: 1,020 contracts (2016–2025) in public DPWH records; 836 recorded as completed and 152 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Tide Protection Embankment, Barangay Poblacion Del Norte, Villaba, Leyte (24IE0033): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/32470ff1-8e12-4c0f-9fa2-66ea2badb8a8 - Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte (24IE0038): Pattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/741333d5-7328-49d6-9c4f-7f4b58236269 - Construction of Tide Protection Embankment, Brgy Silad, Villaba, Leyte (22IE0062): Duplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/9d4d0300-ae30-4aaa-9583-8ef236a611cf - Construction of Flood Control Structure (Caigit to Pangas), Barangay Poblacion Del Norte, Villaba, Leyte (24IE0036): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/0ab2b919-bcee-42d9-b91c-7ec9b6bc7ac2 - Construction of Seawall, Sitio Kawayan, Barangay Sta. Rosa, Tabango, Leyte (23IE0033): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/4be4a438-40e1-487f-85ce-a503028b172f I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/leyte-3rd
Write your representative · FY2027 budget
Leyte (Third District)
Representative: Anna Victoria Veloso-Tuazon · bills and roles · official House profile
Served by: Leyte 3rd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 21 lines selected.
Leyte 3rd DEO
- House version (HB 10858)
- ₱1.05B
- 62 lines
- President’s NEP
- ₱637.5M
- 41 lines
- Added by the House
- 21
- ₱410.0M
- Changed / removed
- 0 / 0
- 41 lines unchanged
Lines that differ from the NEP (21)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Br. Along Sambulawan JCT-Calaguise-Calubian Rd | Added by the House | — | ₱50,000,000 | HB p. 585 |
| Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Bridge (Parallel Bridge), along Sambulawan JCT -Calaguise-Calubian Road | Added by the House | — | ₱40,000,000 | HB p. 586 |
| Construction of Villalon-Bunacan-Daja Road, (Sta. 3+324-3+925, Sta . 5+930-6+329), Calubian and San Isidro, Leyte | Added by the House | — | ₱30,000,000 | HB p. 585 |
| Construction of Villanueva-Kawayanan Road, (Sta. 3=300-Sta. 4+300),Calubian, Leyte | Added by the House | — | ₱30,000,000 | HB p. 585 |
| Construction of Basud-Cadaruhan-Maasin-Palid II Road, (Sta. 5+308-Sta. 6+308), San Isidro, Leyte | Added by the House | — | ₱30,000,000 | HB p. 585 |
| Construction of JNR Consuegra-Wague-Butason Road, (Sta. 3+590-Sta. 4+590), Leyte and Tabango, Leyte | Added by the House | — | ₱30,000,000 | HB p. 585 |
| Construction of JNR bangkal-Sitio Alegria Road, (Sta. 0+775-Sta. 1+774(, Villaba, Leyte | Added by the House | — | ₱20,000,000 | HB p. 585 |
| Construction of Calbugos-Sitio Naga-Capiñahan Road, (Sta. 2+135-Sta.2+885), Villaba Leyte | Added by the House | — | ₱20,000,000 | HB p. 586 |
| Concreting of JNR Consuegra Consuegra-Tapol Road, (Sta. 1+680- 2+680), Leyte, Leyte | Added by the House | — | ₱20,000,000 | HB p. 586 |
| Concreting of Roads, Kawayanan Junction to Ruburan, Calubian, Leyte 11.453134, 124.381547 | Added by the House | — | ₱20,000,000 | HB p. 586 |
| Concreting of Road, Labtic to Bunacan, Calubian, Leyte 11.494748, 124.347568 | Added by the House | — | ₱20,000,000 | HB p. 586 |
| Concreting of Road Catagbacan to Tinghub, Villaba, Leyte 11.189180, 124.409403 | Added by the House | — | ₱20,000,000 | HB p. 586 |
| Concreting of Road Tabunok, Villaba Leyte 11.245741, 124.426452 | Added by the House | — | ₱20,000,000 | HB p. 586 |
| Concreting of Road, Buga-Buga, Villaba, Leyte 11.174963, 124.423733 | Added by the House | — | ₱10,000,000 | HB p. 586 |
| Concreting of Road, Hinabuyan, Villaba, Leyte 11.237073, 124.406538 | Added by the House | — | ₱10,000,000 | HB p. 586 |
| Construction of Multi-Purpose Building, Geronimo Seco St., Omaganhan, Tabango, Leyte | Added by the House | — | ₱10,000,000 | HB p. 850 |
| Construction (Completion) of Multi-Purpose Building in Barangay Ferdinand E. Marcos, Calubian, Leyte, 11.43700, 124.43278 | Added by the House | — | ₱10,000,000 | HB p. 850 |
| Rehabilitation of River Revetment (Sta. 0+068-Sta. 0+140) Barangay Ferdinand E. Marcos, Calubian, Leyte | Added by the House | — | ₱5,000,000 | HB p. 350 |
| Construction of Water Supply System, Barangay Burabod, Leyte, Leyte | Added by the House | — | ₱5,000,000 | HB p. 383 |
| Construction of Water Supply System, Barangay Tapol, Leyte, Leyte | Added by the House | — | ₱5,000,000 | HB p. 383 |
| Construction of Road, Sitio Rimas, Bartangay Palarao, Leyte, Leyte | Added by the House | — | ₱5,000,000 | HB p. 585 |
Past DPWH contracts under this office
1,020 contracts from 2016 to 2025 in public DPWH records (₱14.06B): 836 recorded as completed, 152 as ongoing. 902 have a satellite image check on file. Browse them.
17 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Tide Protection Embankment, Barangay Poblacion Del Norte, Villaba, Leyte 24IE0033 · Completed · ₱48.9MDuplicate or Near-Duplicate Projects
- Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte 24IE0038 · Completed · ₱48.8MPattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects
- Construction of Tide Protection Embankment, Brgy Silad, Villaba, Leyte 22IE0062 · Completed · ₱48.8MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Construction of Flood Control Structure (Caigit to Pangas), Barangay Poblacion Del Norte, Villaba, Leyte 24IE0036 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Seawall, Sitio Kawayan, Barangay Sta. Rosa, Tabango, Leyte 23IE0033 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Silad Tide Embankment (Left Side), Brgy. Silad, Villaba, Leyte 23IE0055 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Suba Tide Embankment, Brgy. Suba, Villaba, Leyte 23IE0049 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Tide Protection Embankment, Suba, Villaba, Leyte 22IE0064 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Barangay Jalas, Villaba, Leyte 24IE0012 · Completed · ₱48.6MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Barangay Sambulawan, Leyte, Leyte 23IE0019 · Completed · ₱48.3MPattern Consistent with Contract Splitting
- Construction of Tide Protection Embankment, Silad Port (Right Side), Brgy. Silad, Villaba, Leyte 22IE0063 · Completed · ₱48.0MPattern Consistent with Contract Splitting
- Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte 23IE0010 · Completed · ₱48.0MPattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.