Barangay

Tukod

Tukod, San Rafael, Bulacan, Region III (Central Luzon). Rural. Population 2,855 (2024 POPCEN).

PSGC 0301422033 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Tukod

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

13 records · ₱387,174,890.85

  1. Sustainable Infrastructure Projects Alleviating Gaps (Sipag)-Sipag-Flood Mitigation Structures Protecting Public Infrastructures/Facilities-Construction of Slope Revetment Structure at Barangay Camachile, Dona Remedios Trinidad, Bulacan₱95,100,081.92 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  2. Construction of Flood Control Structure Along Malangaan River (Upstream), Barangay Camachile, DoñA Remedios Trinidad, Bulacan₱48,249,750.32 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Sustainable Infras Projects Alleviating Gaps (Sipag)-Sipag- Flood Mitigation Structures Protecting Public Infras/ Facilities - Construction of Flood Control Structure Along Malangaan River (Downstream), Barangay Camachile, Dona Remedios Trinidad, Bulacan₱47,549,918.06 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  4. Rehabilitation/Improvement of Pulo-Tukod Road, San Rafael, Bulacan Phase 2₱46,974,696.50 · 2018 · medium confidence (project coordinates inside the barangay boundary)
  5. Basic Infrastructure Program (Bip) - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities - Construction of Riverbank Protection Structure Along Malangan River (Left Bank), Barangay Tukod, San Rafael, Bulacan₱39,599,546.89 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  6. Basic Infrastructure Program (Bip) - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities - Construction of Riverbank Protection Structure Along Malangan River (Right Bank), Barangay Tukod, San Rafael, Bulacan₱39,598,625.52 · 2024 · medium confidence (project coordinates inside the barangay boundary)

How linked: 13 by project coordinates inside the barangay boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

Not yet linked to Tukod itself. This shows the municipality figure for San Rafael.

1 record · ₱123,946,859.70

  1. Municipality of San Rafael, Bulacan₱123,946,859.70 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Tukod itself. This shows the province figure for Bulacan.

33,321 records · ₱249,214,437,722.44

33,270 placed at Bulacan level itself; the rest in LGUs under it.

  1. Bulacan₱249,214,437,722.44 · 33,270 awards · high confidence (area of delivery is this province only)
  2. Aurora, Bataan, Bulacan, Nueva Ecija, Pampanga, Tarlac, Zambales₱315,284,183.51 · 23 awards · low confidence (area of delivery lists several provinces)
  3. Bohol, Bukidnon, Bulacan, Cagayan₱26,967,830.69 · 1 awards · low confidence (area of delivery lists several provinces)
  4. Aurora, Bulacan, Nueva Ecija, Pampanga₱23,640,153.00 · 5 awards · low confidence (area of delivery lists several provinces)
  5. Bulacan, Cagayan₱12,244,267.53 · 2 awards · low confidence (area of delivery lists several provinces)
  6. Bataan, Batanes, Batangas, Benguet, Biliran, Bohol, Bukidnon, Bulacan, Cagayan, Camarines Norte₱8,259,635.30 · 1 awards · low confidence (area of delivery lists several provinces)

How linked: 33,270 by area of delivery is this province only; 51 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Tukod itself. This shows the municipality figure for San Rafael.

4 records · ₱17,500,000.00

  1. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Rehabilitation, Repair and Improvement of Multipurpose Building (Old Municipal Hall)₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
  3. Purchase of Vehicle - Two (2) Units Ambulance₱5,000,000.00 · 2024 · high confidence (location columns in the DBM release)
  4. Purchase of Vehicle - Ambulance₱2,500,000.00 · 2023 · high confidence (location columns in the DBM release)

How linked: 4 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

6 records · ₱305,000,000.00

  1. Construction of Riverbank Protection Structure Along Malangaan River (Downstream), Barangay Tukod, San Rafael, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  2. Construction of Riverbank Protection Structure Along Malangaan River (Upstream), Barangay Tukod, San Rafael, Bulacan₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  3. Construction of Riverbank Protection Structure Along Malangan River ( Left Bank ) , Barangay Tukod, San Rafael, Bulacan₱40,000,000.00 · 2024 · medium confidence (GAA line text names the place)
  4. Construction of Riverbank Protection Structure Along Malangan River ( Right Bank ) , Barangay Tukod, San Rafael, Bulacan₱40,000,000.00 · 2024 · medium confidence (GAA line text names the place)
  5. Construction of Multi - Purpose Building ( Covered Court ) , Brgy. Tukod, San Rafael, Bulacan₱15,000,000.00 · 2024 · medium confidence (GAA line text names the place)
  6. Construction of Multi - Purpose Building, Barangay Tukod, San Rafael, Bulacan₱10,000,000.00 · 2024 · medium confidence (GAA line text names the place)

How linked: 6 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

See all 1 published flag

Contractors on linked DPWH projects

All 9 contractors on DPWH projects linked to Tukod and the LGUs under it. Click a column to sort.

Five Travellers Const INC2₱95,799,668.380
Adsl Const1₱95,100,081.920
Eirish Builders3₱93,823,258.350
Flordes Const1₱46,974,696.500
Jaime Y Viceo Jr Const1₱14,105,205.330
Emica Builders And Supply2₱11,377,217.220
St Timothy Const CORP1₱10,654,407.941
1199s Const1₱9,752,399.610
Vicmar Const INC1₱9,587,955.600

Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share card: Tukod

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Tukod

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG