Lupo, Barili, Cebu, Region VII (Central Visayas). Rural. Population 679 (2024 POPCEN).

PSGC 0702210022 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Lupo

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

Not yet linked to Lupo itself. This shows the municipality figure for Barili.

160 records · ₱4,234,929,019.66

1 placed at Barili level itself; the rest in LGUs under it.

  1. Convergence and Special Support Program, Basic Infrastructure Program (Bip)-Multi-Purpose Buildings/Facilities to Support Social Services, Construction of Multi-Purpose Building, Barangay Poblacion, Barili, Cebu₱197,800,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  2. Oo2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control Structure, Santa Ana River, Barangay Campangga, Barili, Cebu₱183,333,710.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  3. Cssp, Basic Infrastructure Program (Bip) - Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities, Construction of Mantayupan Road (Leading to Bangag Lapos Cave), Barili, Cebu₱178,199,999.70 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  4. Rehabilitation/Reconstruction of Santander Barili Toledo Road, K0065+200-K0065+500 L/S With Slips, Slope Collapse and Landslide, Cebu Province₱167,198,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  5. Organizational Outcome 1: Ensure Safe and Reliable National Road System Network Development Program-Construction of By-Pass and Diversion Roads Barili-Aloguinsan Coastal Road, Cebu, Section 1: Sta.0+000-Sta.1+035, Section 2: Sta.0+000-Sta.1+324, Section 3₱124,749,709.21 · 2020 · medium confidence (project coordinates inside the barangay boundary)
  6. Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development Program, Construction of By-Pass and Diversion Roads, Barili - Aloguinsan Coastal Road, Phase 5, Cebu₱96,500,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)

How linked: 159 by project coordinates inside the barangay boundary; 1 by project coordinates inside the city/municipality boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

1 record · ₱149,841.00

  1. Barangay Lupo, Barili, Cebu₱149,841.00 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Lupo itself. This shows the province figure for Cebu.

161,655 records · ₱506,755,681,657.63

161,308 placed at Cebu level itself; the rest in LGUs under it.

  1. Cebu₱506,755,681,657.63 · 161,308 awards · high confidence (area of delivery is this province only)
  2. Bohol, Cebu, Negros Oriental, Siquijor₱313,071,832.22 · 155 awards · low confidence (area of delivery lists several provinces)
  3. Bohol, Cebu, Negros Oriental₱111,569,883.99 · 53 awards · low confidence (area of delivery lists several provinces)
  4. Bohol, Cebu₱73,351,351.76 · 66 awards · low confidence (area of delivery lists several provinces)
  5. Bohol, Cebu, Siquijor₱60,193,664.40 · 25 awards · low confidence (area of delivery lists several provinces)
  6. Cavite, Cebu₱52,454,843.07 · 12 awards · low confidence (area of delivery lists several provinces)

How linked: 161,308 by area of delivery is this province only; 347 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Lupo itself. This shows the municipality figure for Barili.

3 records · ₱16,606,882.17

2 placed at Barili level itself; the rest in LGUs under it.

  1. Concreting of Farm-to-Market Road₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
  2. Purchase of Medical Or Hospital Equipment, Barili, Cebu, Region Vii (Central Visayas)₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  3. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)

How linked: 3 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

Not yet linked to Lupo itself. This shows the municipality figure for Barili.

126 records · ₱2,044,915,000.00

64 placed at Barili level itself; the rest in LGUs under it.

  1. Construction of Flood Control Structure, Santa Ana River, Barangay Campangga, Barili, Cebu₱190,294,000.00 · 2025 · medium confidence (GAA line text names the place)
  2. Construction of Mantayupan Road ( Leading to Bangag Lapos Cave ) , Barili, Cebu₱180,000,000.00 · 2024 · high confidence (GAA line text names the place)
  3. Construction of Road, Dakit-Mayana Road, Sta. 1+548 - Sta. 6+100, Barili, Cebu₱140,989,000.00 · 2026 · high confidence (GAA line text names the place)
  4. Construction of Barili-Aloguinsan Bypass Road, Barili, Cebu₱100,000,000.00 · 2020 · high confidence (GAA line text names the place)
  5. Construction of Road Leading to Bangag Lapus Cave (Phase 2), Barili, Cebu₱100,000,000.00 · 2025 · high confidence (GAA line text names the place)
  6. Construction of Slope Protection Structure Along Carcar-Barili Road, Sta. 56+000-Sta.57+000, Barili, Cebu₱100,000,000.00 · 2022 · high confidence (GAA line text names the place)

How linked: 126 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

No published flags are linked to Lupo itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Barili.

See all 8 published flags in Barili

Contractors on linked DPWH projects

None linked to Lupo itself; showing Barili.

Share card: Lupo

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Lupo

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG