Municipality
Tampakan
Tampakan, South Cotabato, Region XII (SOCCSKSARGEN). 1st income class. Population 42,304 (2024 POPCEN).
Data-quality note: 18 DPWH projects linked to Tampakan have no coordinates published by DPWH, so they are not on the map and cannot be checked with satellite images.
PSGC 1206314000 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Tampakan
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
73 records · ₱723,083,987.02
19 placed at Tampakan level itself; the rest in LGUs under it.
- Construction of Concrete Road - Poblacion - San Isidro-Liberty-Pulabato-Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of Agribusiness Industry, S₱107,514,929.08 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Const/Imp. of Access Rds Leading to Trades, Ind. and Econ. Zones (Rds Linkages for Ind. and Trade Infra Program-Roll-It)-Poblacion-San-Isidro-Liberty-Pulabato-Palo Rd Connect to Hvcc Plantation Areas and Tampakan Pub Market in Support of Agribusiness Ind₱52,670,166.14 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Constructions of River Bank Protection With Esplanade Along Altayan River, Sta 0+000 - Sta 0+200; Sta 0+000 - Sta 0+160.473, Brgy. Pulabato, Pulabato, Tampakan, South Cotabato₱48,302,865.63 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Const./Impr. of Access Roads Leading to Trades, Industries and Economic Zones, Poblacion - San Isidro - Liberty - Pulabato - Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of Agribusiness Industry, Tampakan, South Cot.₱44,100,000.00 · 2018 · medium confidence (project coordinates inside the barangay boundary)
- Const./Improvement of Access Roads Leading to Trades, Industries and Economic Zones, Poblacion - San Isidro - Liberty - Pulabato - Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of Agribusiness Industry, Tampakan Sc₱34,299,985.45 · 2019 · medium confidence (project coordinates inside the barangay boundary)
- Const. of Classrooms 4 Storey 20 Cl at Tampakan Nhs., Tampakan, South Cotabato₱30,795,903.05 · 2016 · low confidence (project title names the place)
How linked: 54 by project coordinates inside the barangay boundary; 18 by project title names the place; 1 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱508,038,283.84
- Municipality of Tampakan, South Cotabato₱508,038,283.84 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Tampakan itself. This shows the province figure for South Cotabato.
75,257 records · ₱157,551,104,154.08
75,200 placed at South Cotabato level itself; the rest in LGUs under it.
- South Cotabato₱157,551,104,154.08 · 75,200 awards · high confidence (area of delivery is this province only)
- Sarangani, South Cotabato₱51,907,257.72 · 4 awards · low confidence (area of delivery lists several provinces)
- South Cotabato, Southern Leyte, Sultan Kudarat, Sulu, Surigao del Norte₱46,010,739.24 · 1 awards · low confidence (area of delivery lists several provinces)
- Sorsogon, South Cotabato₱29,635,969.94 · 4 awards · low confidence (area of delivery lists several provinces)
- South Cotabato, Southern Leyte₱5,951,824.80 · 35 awards · low confidence (area of delivery lists several provinces)
- Cotabato, Maguindanao, Sarangani, South Cotabato, Sultan Kudarat₱4,369,880.00 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 75,200 by area of delivery is this province only; 57 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
9 records · ₱38,000,000.00
3 placed at Tampakan level itself; the rest in LGUs under it.
- Construction of Multipurpose Buildings in Barangay Poblacion, Tampakan, South Cotabato₱20,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families: Educational Assistance/Scholarship₱3,000,000.00 · 2024 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Construction of Level Ii Potable Water Supply System₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱2,000,000.00 · 2024 · high confidence (location columns in the DBM release)
How linked: 9 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
65 records · ₱715,892,000.00
22 placed at Tampakan level itself; the rest in LGUs under it.
- Poblacion - San Isidro - Liberty - Pulabato - Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of Agribusiness Industry, Tampakan, South Cotabato₱111,632,000.00 · 2022 · high confidence (GAA line text names the place)
- Poblacion-San Isidro-Liberty-Pulabato-Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of Agribusiness Industry, Tampakan, South Cotabato₱55,000,000.00 · 2023 · high confidence (GAA line text names the place)
- Poblacion-San Isidro-Liberty-Pulabato-Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of the Agribusiness Industry, Sta. 10+902- Sta. 12+882, Tampakan, South Cotabato₱52,160,000.00 · 2026 · high confidence (GAA line text names the place)
- Constructions of River Bank Protection With Esplanade Along Altayan River, Brgy. Pulabato, Pulabato, Tampakan, South Cotabato₱50,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Poblacion-San Isidro-Liberty-Pulabato-Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of Agribusiness Industry, Tampakan, South Cotabato₱45,000,000.00 · 2018 · high confidence (GAA line text names the place)
- Poblacion-San Isidro-Liberty-Pulabato-Palo Road Connecting to Hvcc Plantation Areas and Tampakan Public Market in Support of Agribusiness Industry, Tampakan, South Cotabato₱35,000,000.00 · 2019 · high confidence (GAA line text names the place)
How linked: 65 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Tampakan itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, South Cotabato.
- Duplicate or Near-Duplicate ProjectsConstruction of Bank Protection Structure Along Bolok Creek, Koronadal City, South CotabatoContractor: Reydan Builders / Pase Const
- Duplicate or Near-Duplicate ProjectsConstruction of Bank Protection Structure Along Bolok Creek, Koronadal City, South CotabatoContractor: Reydan Builders
- Duplicate or Near-Duplicate ProjectsConstruction of River Bank Protection Along Safali River, Brgy. Naci, Surallah, South CotabatoContractor: Better Work Const / Gabriellas Ent
- Duplicate or Near-Duplicate ProjectsConstruction of River Bank Protection Along Safali River, Brgy. Naci, Surallah, South CotabatoContractor: Reydan Builders
- Cross-Source Mismatch (PhilGEPS vs DPWH)Construction of Riverbank Protection Along Marbel River, Brgy. Carpenter Hill, Koronadal City, South CotabatoContractor: Nirvana Const & Supplies / Ffjj Const
- Duplicate or Near-Duplicate ProjectsConstruction of Riverbank Protection Along Marbel River, Brgy. Carpenter Hill, Koronadal City, South CotabatoContractor: Nirvana Const & Supplies / Ffjj Const
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 38 contractors on DPWH projects linked to Tampakan and the LGUs under it. Click a column to sort.
| F H Gopiteo Const | 10 | ₱184,636,389.77 | 0 |
| Better Work Const | 11 | ₱142,782,097.91 | 0 |
| Gemma Const Supply INC Formerly:Gemma Con | 1 | ₱107,514,929.08 | 0 |
| Amplex Const And Supplies | 3 | ₱29,376,923.62 | 0 |
| Ltb Builders | 3 | ₱25,903,259.19 | 0 |
| Sokabe Const | 1 | ₱24,490,279.33 | 0 |
| Marcus Const | 2 | ₱23,091,695.68 | 0 |
| Fuentabuilt Const CORP | 1 | ₱18,080,259.89 | 0 |
| Marbel Dynamic Builders | 3 | ₱15,576,735.01 | 0 |
| Kgd Builders INC | 5 | ₱13,147,677.31 | 0 |
| Mj Tiongson Const Formerly: Mjt Builders | 1 | ₱12,957,147.83 | 0 |
| The Trendsetter Const And Supply CORP | 2 | ₱12,874,193.76 | 0 |
| Hanna Via Const INC Formerly:Hanna Via Design | 1 | ₱9,578,914.02 | 0 |
| Lhe Const | 1 | ₱7,930,064.58 | 0 |
| C A V Builders And Supply CORP | 2 | ₱7,266,048.33 | 0 |
| Rockstone Const Services | 2 | ₱6,912,228.53 | 0 |
| Jj Maico Const | 2 | ₱5,925,666.50 | 0 |
| Jjte Const CORP | 1 | ₱4,970,005.24 | 0 |
| Rit Const And Supplies | 1 | ₱4,966,555.00 | 0 |
| Five C Const Services | 1 | ₱4,954,290.09 | 0 |
| C E K Const And Water Supply | 1 | ₱4,948,990.22 | 0 |
| Rl Antonne Builders | 1 | ₱4,944,452.65 | 0 |
| Semreh Const | 1 | ₱4,939,919.60 | 0 |
| Gibuild Development CORP | 1 | ₱4,935,360.40 | 0 |
| Tropiland Ent | 1 | ₱4,932,272.52 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in South Cotabato
BIR publishes collections by province and city, not by town or barangay. Tampakan is in South Cotabato.
₱2.57 billion
Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities
Proposed for 2027: DPWH projects
0 line items worth ₱0 in the FY2027 National Expenditure Program (FY2026 NEP: 2 worth ₱24.8M). Counted from lines that name Tampakan.
Source: DBM Details of DPWH Programs/Projects, NEP FY2027 (scanned PDF read by OCR; page numbers given). Search all lines

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in Tampakan (14)
Download this list with counts (CSV) · All bulk data
- Albagan · 1 DPWH projects
- Buto · 3 DPWH projects
- Danlag · 5 DPWH projects
- Kipalbig · 13 DPWH projects
- Lambayong · 5 DPWH projects
- Lampitak · 3 DPWH projects
- Liberty · 2 DPWH projects
- Maltana
- Palo · 1 DPWH projects
- Poblacion · 7 DPWH projects
- Pula-bato · 7 DPWH projects
- San Isidro · 4 DPWH projects
- Santa Cruz · 3 DPWH projects
- Tablu
QR codes for Tampakan
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
