Barangay

Capilan

Capilan, Lebak, Sultan Kudarat, Region XII (SOCCSKSARGEN). Rural. Population 2,716 (2024 POPCEN).

PSGC 1206506005 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Capilan

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

11 records · ₱116,201,133.64

  1. Construction of Makin Bridge Along Lebak - Esperanza Rd, Sultan Kudarat Lebak, Sultan Kudarat₱42,917,140.00 · 2022 · medium confidence (project coordinates inside the barangay boundary)
  2. Construction of Concrete Road - Brgy. Basak-Villamonte-Capilan Connecting to New Calinog in Support of Bamboo and Coffee Plantation, Lebak, Sultan Kudarat₱24,500,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Construction of Concrete Road - Brgy. Basak-Villamonte-Capilan Connecting to New Calinog in Support of Bamboo Coffee Plantation, Lebak, Sultan Kudarat₱24,376,447.17 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  4. Concreting of Tuka - Busok Fmr Brgy. Tuka and Brgy. Busok, Bagumbayan, Sultan Kudarat₱9,651,500.00 · 2018 · medium confidence (project coordinates inside the barangay boundary)
  5. Construction of One (1) Storey - Two (2) Classrooms School Building With Toilet at Capilan Elementary School - (B) Lebak, Sultan Kudarat₱2,845,962.16 · 2018 · medium confidence (project coordinates inside the barangay boundary)
  6. Construction of One (1) Storey - Two (2) Classrooms School Building With Toilet at Capilan Elementary School - (A) Lebak, Sultan Kudarat₱2,790,242.55 · 2018 · medium confidence (project coordinates inside the barangay boundary)

How linked: 11 by project coordinates inside the barangay boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

1 record · ₱460,434.00

  1. Barangay Capilan, Lebak, Sultan Kudarat₱460,434.00 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Capilan itself. This shows the province figure for Sultan Kudarat.

16,562 records · ₱43,786,909,409.45

16,544 placed at Sultan Kudarat level itself; the rest in LGUs under it.

  1. Sultan Kudarat₱43,786,909,409.45 · 16,544 awards · high confidence (area of delivery is this province only)
  2. Sultan Kudarat, Sulu, Surigao del Norte₱105,941,133.49 · 2 awards · low confidence (area of delivery lists several provinces)
  3. South Cotabato, Southern Leyte, Sultan Kudarat, Sulu, Surigao del Norte₱46,010,739.24 · 1 awards · low confidence (area of delivery lists several provinces)
  4. Cotabato, Maguindanao, Sarangani, South Cotabato, Sultan Kudarat₱4,369,880.00 · 1 awards · low confidence (area of delivery lists several provinces)
  5. Cotabato, South Cotabato, Sultan Kudarat₱1,734,108.25 · 4 awards · low confidence (area of delivery lists several provinces)
  6. South Cotabato, Southern Leyte, Sultan Kudarat₱754,531.00 · 4 awards · low confidence (area of delivery lists several provinces)

How linked: 16,544 by area of delivery is this province only; 18 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Capilan itself. This shows the municipality figure for Lebak.

6 records · ₱19,000,000.00

1 placed at Lebak level itself; the rest in LGUs under it.

  1. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Construction of Level Ii Potable Water Supply System₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
  3. Concreting/Rehabilitation of Farm-to-Market Road₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  4. Provision of Renewable Energy-Based Electrification₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  5. Provision of Renewable Energy-Based Electrification₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  6. Construction of Level Ii Potable Water Supply System₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)

How linked: 6 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

3 records · ₱6,500,000.00

  1. Construction ( Completion ) of Multi - Purpose Building ( Gymnasium ) , Capilan Elementary School, Barangay Capilan, Lebak, Sultan Kudarat₱3,000,000.00 · 2024 · medium confidence (GAA line text names the place)
  2. Construction (Completion) of Multi-Purpose Building, Barangay Capilan, Lebak, Sultan Kudarat₱2,500,000.00 · 2025 · medium confidence (GAA line text names the place)
  3. Construction of Multi-Purpose Building (Senior Citizen Building) Brgy. Capilan, Lebak, Sultan Kudarat₱1,000,000.00 · 2019 · medium confidence (GAA line text names the place)

How linked: 3 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

No published flags are linked to Capilan itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Lebak.

See all 5 published flags in Lebak

Contractors on linked DPWH projects

All 5 contractors on DPWH projects linked to Capilan and the LGUs under it. Click a column to sort.

JV Constech7₱58,146,162.310
Cs Const And Supply INC Formerly: Cs Const And Supply1₱42,917,140.000
Raqi Builder Const And Supply1₱9,651,500.000
Jargon Const1₱2,790,242.550
Albanor Const1₱2,696,088.780

Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share card: Capilan

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Capilan

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG