Br Gultiano Const: DPWH projects in Cablalan
1 project linked to Cablalan and the LGUs under it · ₱1,148,063.20 total as recorded by DPWH (single amounts of ₱10B+ excluded). Contractor profile
| Project | Place | Year | Status | Contract cost |
|---|---|---|---|---|
| Cluster 5: 1. Cont. of (3) Units Rain Water Collector @ Tampus Is; 2. Cont. of (3) Units Rain Water Collector @Tona Lim Siao, Sr. Es (Punsad Es); 3. Cont. of (3) Units Rain Water Collector @Batulaki Is; 4. Cont. of (3) Units Rain Water Collector @ Cablala | Cablalan | 2017 | Completed | ₱1,148,063.20 |