5GG CONST FORMERLY: 5G GALVEZ CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 45 linked DPWH project(s) totaling about ₱1,835,200,291.07. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
5GG CONST FORMERLY: 5G GALVEZ CONST AND SUPPLY
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 45
- Total value
- ₱1,835,200,291.07
- Published flags
- 0
- Region
- Northern Samar 1st DEO · Region VIII
Online presence
Licensed officers (PCAB)
- Genaro C. Galvez · Authorized Managing Officer (PCAB license 34736) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for 5GG CONST FORMERLY: 5G GALVEZ CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 74.40 / 100 · Projects in sample: 45 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 53.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 53.6
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 26
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 44
- pastTargetOngoingProjects
- 11
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 45
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 45
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
38 geotagged projects — Open full map · Download projects (CSV)
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD - K0835+554 - K0836+060, K0836+160 - K0836+220, K0836+260 - K0837+750, K0838+000 - K0839+090, K0839+660 - K0839+800, K0839+965 - K0840+052.50, NORTHE23I00094 · ₱192,998,218.99 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR22I00041 · ₱158,673,013.38 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR23I00022 · ₱152,457,304.44 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR24I00001 · ₱145,836,286.88 · mapped
- CONCRETING OF BRGY. MABINI-VICTORY ROAD (ALONG LAS NAVAS-MATUGUINAO ROAD) PHASE 3, BRGY. MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO ROAD, LAS NAVAS, NORTHERN SAMAR24II0101 · ₱97,920,387.10 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PINIPISAKAN FALLS, SAN ISIDRO, LAS NAVAS, NORTHERN SAMAR20II0031 · ₱88,186,560.65 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR21II0024 · ₱87,289,909.73 · mapped
- CONCRETING OF BUGAY-GEGUINTA-BUGTUSAN-MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO, LAS NAVAS - MATUGUINAO ROAD, PHASE IV, BRGY. BUGAY-GEGUINTA-BUGTUSAN-MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO, LAS NAVAS, NORTHERN SAMAR24II0102 · ₱65,603,192.68 · mapped
- ASSET PRESERVATION - REHABILITATION//RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0833+560 - K0833+900, K0834+299 - K0834+460, K0839+000 - K0839+786, K0840+200 - K0840+300, K0851+740 -25I00039 · ₱58,146,961.99 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0783+456 - K0783+60125I00092 · ₱53,048,773.87 · mapped
- CSSP: ACCESS ROAD LEADING TO PINIPISAKAN FALLS, SAN JORGE, SAMAR23IJ0011 · ₱48,950,788.36 · mapped
- CSSP: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), ACCESS ROAD LEADING TO BANGON FALLS, BRGY. TINAPLACAN, CALBAYOG CITY23IJ0023 · ₱48,944,649.14 · mapped
- CSSP: CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TAGAPUL-AN, SAMAR23IJ0034 · ₱48,793,811.84 · mapped
- CSSP: (RE-ADVERTISED) CONSTRUCTION OF ROAD, BRGY. BALOCAWE - NIPA TAGAPUL-AN, SAMAR23IJ0057 · ₱48,746,078.39 · mapped
- CONCRETING OF LOCAL ROAD, BRGY. SAN VICENTE-PALANTUGON-ALBALATE, CATBALOGAN CITY, BRGY. SAN VICENTE, CATBALOGAN CITY, SAMAR21IK0023 · ₱38,630,667.56 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PINIPISAKAN FALLS, SAN ISIDRO, LAS NAVAS, NORTHERN SAMAR19II0030 · ₱36,813,841.97 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHAB. OF LAS NAVAS FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, CATUBIG RIVER BASIN, LAS NAVAS, NORTHERN SAMAR25II0023 · ₱34,267,911.70 · mapped
- ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0761+978 - K0762+137, K0762+755 - K0763+140, K0764+700 - K0765+05025I00113 · ₱31,673,967.50 · mapped
- ROAD WIDENING - DAANG MAHARLIKA RD (SM) (SAN ISIDRO - SAN JUANICO BR.) - K0690+400 - K0691+250, VICTORIA, N. SAMAR20IH0008 · ₱31,061,696.27 · mapped
- ROAD WIDENING - CATARMAN - CALBAYOG ROAD - K0755+585 - K0755+775, K0759+883 - K0759+1472, CATARMAN, N. SAMAR18IH0013 · ₱29,478,609.15 · mapped
- CSSP-SIPAG- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR25IK0014 · ₱29,378,513.87 · mapped
- CONCRETING/REHAB. OF PABANOG-TIGBAWON ROAD (PHASE I), BRGY. PABANOG, TIGBAWON, PARANAS, SAMAR21IK0003 · ₱29,111,737.79 · mapped
- ROAD WIDENING ALONG CATARMAN - CALBAYOG ROAD (S00004SM) - K0771+268 - K0771+748, LOPE DE VEGA, NORTHERN SAMAR23IH0069 · ₱26,324,166.33 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- CATARMAN-CALBAYOG RD - K0769 + 447 - K0769 + 551, LOPE DE VEGA, NORTHERN SAMAR22IH0044 · ₱25,891,186.74 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDINGS & OTHER STRUCTURES - MULTIPURPOSE / FACILITIES -RETROFITTING/ STRENGTHENING OF PUBLIC BUILDINGS IN PREPARATION FOR THE BIG ONE - CENTENO BUIL20OE0229 · ₱24,116,333.24 · mapped
- CSSP: CONSTRUCTION OF ROAD, BRGY. SAN AGUSTIN - BRGY. HINOGACAN ROAD, GANDARA, SAMAR24IJ0099 · ₱20,732,514.22 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD FROM POBLACION (BRGY. SILA) LEADING TO PINK BEACH, BRGY. SILA, SAN VICENTE, N. SAMAR18IH0019 · ₱18,967,002.15 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR) - K0688 + 150 - K0688 + 200, SAN ISIDRO, NORTHERN SAMAR22IH0052 · ₱18,607,065.29 · mapped
- ROAD WIDENING - DAANG MAHARLIKA RD (SM) (SAN ISIDRO - SAN JUANICO BR.) - K0680+540 - K0681+050, SAN ISIDRO, N. SAMAR20IH0013 · ₱17,214,038.25 · mapped
- REHABILITATION OF SAN ROQUE PUBLIC MARKET, SAN ROQUE, NORTHERN SAMAR19II0117 · ₱14,697,850.56 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROAD-SECONDARY ROAD, BRGY. CAN-ABAY, BASEY, SAMAR ALONG SAN JUANICO-BASEY-SOHOTON ROAD, K0901+000-K0901+33021IK0002 · ₱14,320,894.83 · mapped
- CONCRETING OF BRGY. CULARIMA TO BRGY. GEN. MALVAR FMR, BRGY. CULARIMA TO BRGY. GEN. MALVAR, CATARMAN, NORTHERN SAMAR21IH0091 · ₱9,747,783.46 · mapped
- CONCRETING OF BRGY. POLANGI TO BRGY. PATICUA FMR, BRGY. POLANGI AND PATICUA, CATARMAN, NORTHERN SAMAR20IH0122 · ₱9,609,817.04 · mapped
- DARAM CIRCUMFERENTIAL ROAD LEADING TO AGUTAY AND CANDIWATA ROCK ISLET. DARAM, SAMAR21IK0004 · ₱9,585,914.41 · mapped
- CONSTRUCTION/IMPROVEMENT ECO-TOURISM ROAD, MACAGTAS DAM ECO-PARK ACCESS ROAD, CATARMAN, NORTHERN SAMAR15IH0193 · ₱9,183,984.81
- LOCAL INFRASTRUCTURE PROGRAM, CONCRETING OF PAMBUJAN - CIRCUMFERENTIAL ROAD, CABABTOAN - CABARIAN - CANJUMADAL - MANAJAO - CAMPARANGA SECTION, PAMBUJAN, NORTHERN SAMAR II15II0111 · ₱9,161,555.55
- CONCRETING OF BRGY. PAYSUD - BRGY. CABARIWAN FARM TO MARKET ROAD, BRGY. PAYSUD AND BRGY. CABARIWAN, PALAPAG, NORTHERN SAMAR17II0074 · ₱9,150,983.74
- Construction of Drainage Structure Gandara II Central Elementary School Gandara, Samar24IJ0063 · ₱7,887,413.96 · mapped
- REPAIR AND UPGRADING OF GB TAN DISTRICT HOSPITAL AT LAOANG, NORTHERN SAMAR II16II0083 · ₱7,289,065.79
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 150 ZONE 13, MANILA CITY22OE0135 · ₱6,432,971.92 · mapped
- PREVENTIVE MAINT. - SECONDARY ROADS ALONG SAN JUANICO - BASEY - SOHOTON ROAD, K0902+000 - K0902+523, BRGY. CAN-ABAY, BASEY, SAMAR21IK0006 · ₱5,755,575.24 · mapped
- LOCAL INFRASTRUCTURE PROGRAM, CONCRETING OF PAMBUJAN CIRCUMFERENTIAL ROAD, CABARI-AN TO CANJUMADAL ROAD, PAMBUJAN, NORTHERN SAMAR II17II0005 · ₱4,540,191.40
- REHABILITATION/RECONSTRUCTION OF ARTECHE - JIPAPAD - LAS NAVAS - RAWIS ROAD, CHAINAGE 9418 - CHAINAGE 9552 (STA. 813+650 - STA. 813+783.50), BRGY. BUGAY, LAS NAVAS, NORTHERN SAMAR15II0112 · ₱4,165,555.55 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BARANGAY SANGPUTAN, SAN VICENTE, N. SAMAR16IH0064 · ₱3,923,091.08
- CONSTRUCTION OF BRGY. ROADS, BRGY. SANGPUTAN, SAN VICENTE, N. SAMAR17IH0079 · ₱1,882,452.26
Equipment & capacity
PCAB license
- License no.
- 34736
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jan 10, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 34736); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
7 evaluations listed across 6 GPPB CPES releases; average final rating 90.7% over 2 rated projects; 7 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Apr 2, 2025 | BSP | ₱2,518,413.00 | On-going | 84.5% | — | 39th (rev), p. 4 |
| Jul 31, 2024 | DPWH | ₱7,870,104.00 | On-going | 96.6% | — | 38th, p. 3 |
| Apr 15, 2024 | DPWH (JV) | ₱192,998,219.00 | On-going | 81.5% | — | 38th, p. 3 |
| Nov 23, 2023 | DPWH (JV) | ₱191,069,073.00 | On-going | 89.4% | — | 37th, p. 2 |
| Sep 13, 2023 | DPWH | ₱48,950,788.00 | Final | 94.4% | 87.3% | 36th, p. 3 |
| Mar 23, 2023 | DPWH | ₱25,891,187.00 | Completed | 92.9% | 94.2% | 35th, p. 2 |
| Jun 30, 2022 | DPWH | ₱25,891,187.00 | On-going | 95.0% | — | 34th, p. 1 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →