ANLE CONST is listed as a company organization in Philippine public procurement records on this site, with 25 linked DPWH project(s) totaling about ₱208,691,865.17. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
ANLE CONST
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 25
- Total value
- ₱208,691,865.17
- Published flags
- 0
- Region
- Northern Samar 2nd DEO · Region VIII
Online presence
Google Maps: Anle ConstructionGoogle Maps, 2026-10-22
doce maysaysay, GH8H+342, Bobon, Northern Samar
Licensed officers (PCAB)
- andrew cabrera acebuche · Authorized Managing Officer (PCAB license 48373) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ANLE CONST — not an accusation or finding of wrongdoing.
Score: 69.80 / 100 · Projects in sample: 25 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 48.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 48.2
- lateCompletedProjects
- 9
- onTimeCompletedProjects
- 9
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 23
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 88/100 · Weight: 24%
- totalProjects
- 25
- componentScore
- 88
- terminatedProjects
- 1
- terminationRatePct
- 4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 24
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 25
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 25
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
25 geotagged projects — Open full map · Download projects (CSV)
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES PALAPAG PARALLEL BR. (B00604SM) ALONG PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD., PALAPAG, NORTHERN SAMAR25II0044 · ₱24,074,707.70 · mapped
- CONCRETING OF BARANGAY LIBJO FMR, CATARMAN, NORTHERN SAMAR21IH0099 · ₱16,839,901.58 · mapped
- CONCRETING OF BRGY. MAGTAON FARM TO MARKET ROAD, MAPANAS, NORTHERN SAMAR24II0082 · ₱14,914,740.44 · mapped
- CONCRETING OF BRGY. TO BRGY. GINAGDANAN FMR, SAN ROQUE, NORTHERN SAMAR24II0081 · ₱14,894,890.76 · mapped
- CONCRETING OF BARANGAY BANTOLINAO TO BARANGAY AGUADA FMR, BRGY. BANTOLINAO AND BRGY. AGUADA, ROSARIO, NORTHERN SAMAR21IH0096 · ₱12,376,162.74 · mapped
- CONCRETING OF BRGY. POLANGI TO BRGY. PATICUA FMR PHASE II, BRGY. POLANGI & BRGY. PATICUA, CATARMAN, NORTHERN SAMAR,21IH0105 · ₱11,918,118.14 · mapped
- CONCRETING OF BRGY. YABYABAN TO BRGY. CABAGNGAN FMR, LAOANG, NORTHERN SAMAR24II0083 · ₱9,924,816.53 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), UNIVERSITY OF EASTERN PHILIPPINES, CATARMAN, NORTHERN SAMAR23IH0127 · ₱9,883,609.33 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. PANGPANG, PALAPAG, N. SAMAR24II0053 · ₱9,882,506.07 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - ALLEN OLD RD - K0697+(-168) - K0697+160, (S00041SM) CHAINAGE 052 - CHAINAGE 090, ALLEN, NORTHERN SAMAR22IH0064 · ₱9,877,106.54 · mapped
- PREVENTIVE MAINTENANCE: ASPHALT OVERLAY - ALLEN - CATARMAN RD - K0741+630 - K0741+815, K0742+195 - K0742+395, K0742+497 - K0742+767, CATARMAN, NORTHERN SAMAR22IH0013 · ₱9,737,326.61 · mapped
- CONCRETING OF LAS NAVAS - SAN JORGE, LAS NAVAS, NORTHERN SAMAR21II0035 · ₱9,527,134.46 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) BARANGAY ANITO, GAMAY, NORTHERN SAMAR23II0028 · ₱7,872,104.48 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. CALOMOTAN, LAOANG, NORTHERN SAMAR24II0052 · ₱6,891,792.34 · mapped
- PREVENTIVE MAINTENANCE, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD., K0809+000-K0809+480, 2ND DISTRICT, NORTHERN SAMAR23II0002 · ₱5,885,417.11 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), PHASE II, BARANGAY LONDRES, ALLEN, NORTHERN SAMAR22IH0037 · ₱5,784,069.82 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT) AT BRGY. DAO, GAMAY, NORTHERN SAMAR25II0049 · ₱4,944,515.21 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 6 POBLACION, PAMBUJAN, NORTHERN SAMAR23II0027 · ₱4,887,530.18 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) PHASE II, BARANGAY SALHAG, ROSARIO, NORTHERN SAMAR22IH0083 · ₱4,860,195.50 · mapped
- CONSTRUCTION OF ROAD, BARANGAY BAYBAY, CATARMAN, NORTHERN SAMAR22IH0038 · ₱4,850,529.83 · mapped
- CONSTRUCTION OF DRAINAGE CANAL, BARANGAY 1 & 2 POBALCION, CATUBIG, N. SAMAR21II0038 · ₱3,821,508.73 · mapped
- CONSTRUCTION OF DRAINAGE CANAL, BARANGAY SANTA POTENCIANA, MAPANAS, NORTHERN SAMAR21II0039 · ₱3,123,047.08 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - DIZO BR. (B00267SM) ALONG CATARMAN-CALBAYOG RD, LOPE DE VEGA, NORTHERN SAMAR22IH0087 · ₱960,172.43 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES LONDRES BR. (B00275SM) ALONG ALLEN-CATARMAN RD, ALLEN, NORTHERN SAMAR22IH0068 · ₱959,961.56 · mapped
- CONSTRUCTION/IMPROVEMENT OF ROAD, BARANGAY BANTOLINAO TO BARANGAY AGUADA, ROSARIO, NORTHERN SAMAR21IH0060 · ₱0.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 48373
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Aug 18, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 48373); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
1 evaluation listed across 1 GPPB CPES release; 1 site-visit rating. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 4, 2025 | DPWH | ₱24,074,708.00 | On-going | 91.8% | — | 40th, p. 32 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →