ILON MULTIBUILDERS CO FORMERLY: SHERATANNOR ENGINEERING CONST is listed as a company organization in Philippine public procurement records on this site, with 46 linked DPWH project(s) totaling about ₱162,610,791.76. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ILON MULTIBUILDERS CO FORMERLY: SHERATANNOR ENGINEERING CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 46
- Total value
- ₱162,610,791.76
- Published flags
- 0
- Region
- Sultan Kudarat 2nd DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for ILON MULTIBUILDERS CO FORMERLY: SHERATANNOR ENGINEERING CONST — not an accusation or finding of wrongdoing.
Score: 77.20 / 100 · Projects in sample: 46 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 59.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 59.8
- lateCompletedProjects
- 37
- onTimeCompletedProjects
- 9
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 46
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 46
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 46
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 46
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 46
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
44 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF TWO (2) STOREY - SIX (6) CLASSROOMS AT BALUAN SENIOR HIGH SCHOOL PALIMBANG, SULTAN KUDARAT18MH0128 · ₱12,748,724.82 · mapped
- CLUSTER A: CONST. OF 3UNITS 1STY 3CL SCHOOL BUILDING (TOILET ATTACHED), SIMBUHAY ES, KABACAN, COTABA17MD0150 · ₱11,027,254.44
- CONSTRUCTION OF TWO (2) STOREY - TWO (2) LABORATORY (ICT LAB) AT PALIMBANG NATIONAL HIGH SCHOOL PALIMBANG, SULTAN KUDARAT18MH0130 · ₱9,466,608.80 · mapped
- CONSTRUCTION OF THREE (3) UNITS - UNIQUE WORKSHOP (7X22.5) BUILDING AT PALIMBANG NATIONAL HIGH SCHOOL PALIMBANG, SULTAN KUDARAT17MH0249 · ₱9,083,207.17 · mapped
- CONSTRUCTION OF 1 UNIT-2STY 4CL AT LAMBUSONG ES, SURALLAH, SOUTH COTABATO18MG0192 · ₱8,560,671.60 · mapped
- CONST. OF 2UNITS UNIQUE WORKSHOP BUILDING 1 & 2, KABACAN SHS, KABACAN, COTABATO17MD0247 · ₱6,223,057.64 · mapped
- CONSTRUCTION OF TWO (2) UNITS - UNIQUE WORKSHOP (7X22.5) BUILDING AT BAGUMBAYAN NATIONAL HIGH SCHOOL BAGUMBAYAN, SULTAN KUDARAT17MH0239 · ₱6,214,264.93 · mapped
- CONSTRUCTION OF ONE (1) STOREY - FIVE (5) CLASROOMS SCHOOL BUILDING WITH TOILET AT PALIMBANG NATIONAL HIGH SCHOOL PALIMBANG, SULTAN KUDARAT17MH0246 · ₱6,162,269.24 · mapped
- CONSTRUCTION OF ONE (1) STOREY - FOUR (4) CLASSROOMS SCHOOL BUILDING AT PALIMBANG NATIONAL HIGH SCHOOL PALIMBANG, SULTAN KUDARAT17MH0248 · ₱5,181,429.09 · mapped
- CONST. OF 1 STOREY 5CL SCHOOL BUILDING (TOILET ATTACHED), SILIK CES, PIKIT, COTABATO17MD0232 · ₱5,004,325.45 · mapped
- CONST. OF 1STY 5CL SCHOOL BUILDING (TOILET ATTCHED), CENTRAL PANATAN PRIMARY SCHOOL, PIGCAWAYAN, COTABATO17MD0231 · ₱4,849,036.45 · mapped
- CONSTRUCTION OF ONE (1) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING AT SALUMPING ELEMENTARY SCHOOL ESPERANZA, SULTAN KUDARAT17MH0138 · ₱4,764,681.62 · mapped
- CONSTRUCTION OF ONE (1) STOREY - THREE (3) CLASSROOMS SCHOOL BUILDING AT DATUGAMBANGANSALILING PRIMARY SCHOOL ESPERANZA, SULTAN KUDARAT17MH0145 · ₱3,777,735.47 · mapped
- CONSTRUCTION OF ONE (1) STOREY - THREE (3) CLASSROOMS SCHOOL BUILDING AT KANALAN ELEMENTARY SCHOOL ESPERANZA, SULTAN KUDARAT17MH0142 · ₱3,777,735.47 · mapped
- CONSTRUCTION OF UNIQUE WORKSHOP BUILDING (7X22.5) AT PALIMBANG NATIONAL HIGH SCHOOL - (A) PALIMBANG, SULTAN KUDARAT17MH0208 · ₱3,294,371.28 · mapped
- CONSTRUCTION OF UNIQUE WORKSHOP BUILDING (7X22.5) AT BAGUMBAYAN NATIONAL HIGH SCHOOL - (A) BAGUMBAYAN, SULTAN KUDARAT17MH0176 · ₱3,180,357.85 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING WITH TOILET AT TIBUHOL ELEMENTARY SCHOOL PALIMBANG, SULTAN KUDARAT17MH0305 · ₱2,900,187.58 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING WITH TOILET AT PALIMBANG NATIONAL HIGH SCHOOL PALIMBANG, SULTAN KUDARAT17MH0247 · ₱2,870,640.96 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING WITH TOILET AT MAGUID ELEMENTARY SCHOOL PALIMBANG, SULTAN KUDARAT17MH0302 · ₱2,849,221.96 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING AT MANGUDADATU NATIONAL HIGH SCHOOL-VILLAMONTE ANNEX LEBAK, SULTAN KUDARAT17MH0159 · ₱2,708,522.17 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING AT LAQUICON ES - (B) BAGUMBAYAN, SULTAN KUDARAT17MH0169 · ₱2,708,522.17 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING AT LAQUICON ES - (A) BAGUMBAYAN, SULTAN KUDARAT17MH0168 · ₱2,703,442.17 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING WITH TOILET ATTACHED AT PIGEL ELEMENTARY SCHOOL - (B) LEBAK, SULTAN KUDARAT17MH0171 · ₱2,700,902.17 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING WITH TOILET ATTACHED AT PIGEL ELEMENTARY SCHOOL - (A) LEBAK, SULTAN KUDARAT17MH0170 · ₱2,700,902.17 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING AT VILLAMONTE ELEMENTARY SCHOOL LEBAK, SULTAN KUDARAT17MH0153 · ₱2,690,462.79 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING AT DATU WASAY ELEMENTARY ELEMENTARY SCHOOL KALAMANSIG, SULTAN KUDARAT17MH0147 · ₱2,690,462.79 · mapped
- CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING AT UGIS ELEMENTARY SCHOOL ESPERANZA, SULTAN KUDARAT17MH0141 · ₱2,690,462.79 · mapped
- CONST. OF 1STY 2CL SCHOOL BLDG (TOILET ATTACHED), KITUBOD HIGH SCHOOL, LIBUNGAN, COTABATO17MD0186 · ₱2,654,092.34 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED), TAMBAD ES, CARMEN, COTABATO17MD0107 · ₱2,615,340.26 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, PIGCAWAYAN, NORTH COTABATO20MD0098 · ₱2,519,046.18 · mapped
- CONSTRUCTION OF MULTI-PURPOSED BUILDING (MINI GYM) BARANGAY SAN ROQUE, PALIMBANG, PALIMBANG, SULTAN KUDARAT 2ND LD16MH0005 · ₱2,412,913.13 · mapped
- CONST. OF 1UNIT SHS UNIQUE WORKSHOP BLDG, PIGCAWAYAN NHS, PIGCAWAYAN, COTABATO16MD0057 · ₱2,371,019.13 · mapped
- CONST. OF 1STY 2CL SB (TOILET ATTACHED) KIBAYAO ES, CARMEN, COTABATO17MD0104 · ₱2,206,591.84 · mapped
- CONST. OF 1STY 2CL SCHOOL BUILDING (TOILET ATTACHED), DUALING ELEMENTARY SCHOOL, ALEOSAN, NORTH COTABATO17MD0179 · ₱2,142,293.30 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MINAPAN HIGH SCHOOL, BRGY. MINAPAN, TULUNAN, NORTH COTABATO19MC0037 · ₱1,953,057.75 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING) BRGY. BALUAN, PALIMBANG, SULTAN KUDARAT19MH0070 · ₱995,968.77 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER) BRGY. KANIPAAN, PALIMBANG, SULTAN KUDARAT19MH0030 · ₱990,190.63 · mapped
- CONSTRUCTION OF BARANGAY HALL KANIPAAN, PALIMBANG, SULTAN KUDARAT18MH0016 · ₱982,329.99 · mapped
- CONSTRUCTION OF BARANGAY HALL AKOL, PALIMBANG, SULTAN KUDARAT18MH0019 · ₱982,329.99 · mapped
- CONSTRUCTION OF BARANGAY HALL POBLACION, PALIMBANG, SULTAN KUDARAT18MH0017 · ₱982,329.99 · mapped
- CONSTRUCTION OF SENIOR CITIZEN BUILDING (MPB - 7M X 8M), BRGY. KOLONG-KOLONG, PALIMBANG, SULTAN KUDARAT17MH0002 · ₱982,278.61 · mapped
- REHAB/MAJ REPAIR OF PERMANENT BRIDGE OLANDANG BR. 1 (B00329MN) ALONG MID-MAKAR RD, OLANDANG, MIDSAYA16MD0009 · ₱934,499.99 · mapped
- CONST/RENOVATION OF HEALTH CENTER, BRGY. PISAN, KABACAN, COTABATO17MD0077 · ₱889,209.59 · mapped
- CONST/RENOVATION OF HEALTH CENTER, BRGY. KATIDTUAN, KABACAN, COTABATO17MD0078 · ₱889,141.08 · mapped
- CONST./RENOVATION OF HEALTH CENTER, BRGY. MALAMOTE, KABACAN, COTABATO17MD0096 · ₱889,130.79
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) BRGY. SAN ROQUE, PALIMBANG, SULTAN KUDARAT19MH0039 · ₱689,567.36 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →