A M ORETA is listed as a company organization in Philippine public procurement records on this site, with 28 linked DPWH project(s) totaling about ₱2,503,309,623.06. Recorded delivery grade F (from public DPWH project records — not a finding of wrongdoing).
A M ORETA
FGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 28
- Total value
- ₱2,503,309,623.06
- Published flags
- 0
- Region
- Las Piñas-Muntinlupa DEO · National Capital Region
Online presence
amoreta.comGoogle Maps business profile, 2026-10-22
Google Maps: A M Oreta And Company, Incorporated★ 5 (3 reviews)Google Maps, 2026-10-22
5th Floor Ermita Building, Arquiza, Corner Alhambra St, Ermita, Makati City, 1000 Metro Manila
Public Record Grade
A transparent, data-derived summary of reported public records for A M ORETA — not an accusation or finding of wrongdoing.
Score: 59.90 / 100 · Projects in sample: 28 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 17/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 17
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 7
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 26
- pastTargetOngoingProjects
- 18
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 28
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.3
- componentScore
- 100
- projectsWithAbcAndCost
- 28
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 28
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 28
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF RFU-NCR MEGA LABORATORY BUILDING PHASE II, 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY (PHASE 2)24OB0321 · ₱238,666,327.62 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE 1)25OB0334 · ₱145,024,597.00 · mapped
- CONSTRUCTION OF RFU-NCR MEGA LABORATORY BUILDING PHASE II, 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY (PHASE 4)24OB0299 · ₱143,273,090.42 · mapped
- CONSTRUCTION OF RFU-NCR MEGA LABORATORY BUILDING PHASE II, 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY (PHASE 3)24OB0298 · ₱143,258,867.84 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (RFU-NCR MEGA LABORATORY BUILDING), 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY (PHASE V)25OB0451 · ₱141,782,606.03
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (RFU-NCR MEGA LABORATORY BUILDING), 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY (PHASE VI)25OB0452 · ₱141,782,392.82
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) AYAGA - STA. MARCELA - FLORA - LASAM ROAD, CHAINAGE 18019 - CHAINAGE 2261918P00001 · ₱124,551,264.00 · mapped
- RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) APAYAO-ILOCOS NORTE ROAD, K0611+186 - K0614+476, K0615+485 - K0616+00016P00044 · ₱123,346,028.09
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SOUTHVILLE 3, BARANGAY POBLACION, MUNTINLUPA CITY25OI0078 · ₱94,569,939.22 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MANGANGATE RIVER, MUNTINLUPA CITY25OI0054 · ₱94,087,162.61 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS: DAANG MAHARLIKA (LZ) - K0026+(-120) - K0027+285.28, MUNTINLUPA23OI0004 · ₱93,294,633.92 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (RFU-NCR MEGA LABORATORY BUILDING) (WITH EQUIPMENT), 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY23OB0383 · ₱81,188,147.02
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUNASAN RIVER (DOWNSTREAM), MUNTINLUPA CITY24OI0018 · ₱77,923,074.64 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MAGDAONG RIVER, MUNTINLUPA CITY24OI0053 · ₱77,351,408.87 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MANILA EAST ROAD, K0058+300 - K0058+92024DO0090 · ₱77,000,245.00 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS: ALABANG - MUNTINLUPA RD - K0029+(-075) - K0029+549, K0030+000 - K0030+942, K0031+067 - K0031+852, K0031+892 - K0031+914, MUNTINLUPA CITY25OI0039 · ₱75,920,951.40 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT LAKESHORE COMPLEX, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE 4)25OB0361 · ₱72,752,854.74 · mapped
- CONSTRUCTION OF MAGDAONG ROAD INCLUDING DRAINAGE SYSTEM, BARANGAY POBLACION, MUNTINLUPA CITY24OI0032 · ₱69,122,488.34 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, SEC. 1: K0038+540.09-K0038+736.90, SEC. 2: K0039+320-K0039+380, SEC. 3: K0048+307.54-K0048+979.3516H00044 · ₱65,284,504.30 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MANILA EAST RD - K0042+613 - K0043 + 335, K0044 + 000 - K0044 + 25025DO0005 · ₱56,864,167.44 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES, TALAVERA BRIDGE (B00546CB) ALONG TOLEDO-TABUELAN-SAN REMEGIO ROAD BRIDGE PROPER: K050+704-K050+764, APPROACH A: K050+490-K050+704, APPROACH B: K050+764-K016H00001 · ₱55,651,034.88 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SAGBAT-PILILLA DIV RD - K0055+200 - K0056+40523DO0009 · ₱53,364,500.00 · mapped
- CONSTRUCTION OF ROAD, NBP COMPOUND, BARANGAY POBLACION, MUNTINLUPA CITY23OI0023 · ₱48,998,975.41 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT LAKESHORE COMPLEX, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE 7)25OB0435 · ₱48,502,747.98 · mapped
- CONSTRUCTION OF ROAD AND SLOPE PROTECTION AT MAGDAONG ROAD, BARANGAY POBLACION, MUNTINLUPA CITY23OI0046 · ₱46,549,999.97 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CORAZON C. AQUINO AVE. - K0033 + 400 - K0034 + 615, K0037 + 600 - K0037 + 87525DO0007 · ₱45,345,383.99 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - MANILA EAST RD - K0064+450 - K0064+70025DO0052 · ₱37,743,018.96 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - MARIKINA-INFANTA RD - K0051+665 - K0051+685, K0052+25DO0051 · ₱30,109,210.55 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →